Name of the Project
Madaouela uranium project.

Location
Agadez region, northern Niger.

Project Owner/s
GoviEx.

Project Description
The project hosts one of the biggest uranium resources in the world, with 100-million pounds of uranium in measured and indicated mineral resources, and inferred resources of 20-million pounds of uranium.

The mineral resources comprise the Miriam, M&M, MSNE, MYVE, MSEE and MSCE sandstone-hosted uranium deposits.

The project is based on a self-sustaining operation, including process plant and renewable power supply, with no reliance on third-party facilities.

Mining operations for the project are planned to be based on standard truck-and-shovel openpit mining for the Miriam deposit at one-million tonnes a year of ore feed to the process plant.

The M&M and MSNE-Maryvonne deposits are planned to be mined as two separate underground room-and-pillar operations. M&M is to be mined first after the completion of the Miriam openpit operation, with MSNE-Maryvonne mined after M&M.

At both underground operations, the mine development and ore production operations are planned to be mined using conventional drill-and-blast methods.

The process plant is designed around two-stage acid leaching to maximise uranium and molybdenum recovery while reducing overall acid consumption.

Plant feed is designed at one-million tonnes a year, with ore initially crushed before milling.

Life-of-mine uranium production is estimated at 50.8-million pounds of uranium, averaging 2.67-million pound of uranium a year over
19 years.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, $140-million and an internal rate of return of 13.3%.

Capital Expenditure
$343-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
SRK Consulting and SGS Bateman (feasibility).

Contact Details for Project Information
GoviEx, tel +1 604-681-5529 or email info@goviex.com.