https://newsletter.en.creamermedia.com
  

20th Floor · The Halyard · 4 Christiaan Barnard Street · Foreshore · Cape Town · 8001 · South Africa

  
Juwi image

Juwi News

Elikhulu solar photovoltaic power project, South Africa – update

3rd June 2022

Pan African Resources has reported that the solar plant has started supplying electricity to the group’s Elikhulu surface retreatment operations. 


Sedibelo Platinum to play important part in South Africa’s green hydrogen effort – Frandsen

31st May 2022

Sedibelo Platinum Mines, in South Africa’s North West province, will be playing a very important part in South Africa's green hydrogen effort to ensure that it contributes to a greener South... 


Elikhulu solar photovoltaic power project, South Africa – update

13th May 2022

The solar plants started supplying electricity to the Elikhulu surface retreatment operations on May 6. 


Pan African successfully commissions 10 MW solar PV plant at Evander

10th May 2022

Gold miner Pan African Resources says the 10 MW solar photovoltaic (PV) plant at its Evander gold miner started supplying electricity to the group’s Elikhulu surface retreatment operations, as part... 


Pilanesberg Platinum Mines energy project, South Africa

18th March 2022

Sedibelo Platinum Mines expects its proposed renewable-energy projects to reduce the Pilanesberg Platinum Mines carbon emissions by about 45%, resulting in significant cost savings. 


75 MW renewable energy project for Sedibelo Platinum

11th March 2022

Pilanesberg Platinum Mines, a subsidiary of Sedibelo Platinum, has appointed the juwi/Sturdee Energy consortium as preferred bidder to supply renewable energy to the mining operation. The parties... 


Elikhulu solar photovoltaic power project, South Africa – update

11th March 2022

The first photovoltaic solar plant to be completed and commissioned by a mining company in South Africa is on track to produce 100% steady-state power generation by May. 


Solar plant to be commissioned by May

4th March 2022

The first photovoltaic (PV) solar plant to be completed and commissioned by a mining company in South Africa is on track to produce 100% steady-state power generation by May, says midtier gold... 


4
5
6

Latest News by Engineering News

Trump falsely insists Afrikaners face genocide in heated meeting

21st May 2025

US President Donald Trump rejected South African President Cyril Ramaphosa’s argument that there’s no genocide against White Afrikaners, airing a video and showing images in the Oval Office that he... 


SA Canegrowers welcomes no increase in sugar tax

21st May 2025

Industry body SA Canegrowers says it welcomes the decision by Finance Minister Enoch Godongwana not to enact any further increases in the Health Promotion Levy – or sugar tax – in his latest... 


Eskom issues invitation to tender for construction of a green hydrogen facility

21st May 2025

State-owned utility Eskom has issued an invitation to tender (ITT) for the construction of a pilot renewable green hydrogen facility (RHF) at its Research, Testing and Development (RT&D) unit, in... 


pqt: 0.081s - ct: 0.628s - 133pq - 2rq
Subscribe Now