JUWI to operate 85 MW solar park in South Africa
Renewable energy group JUWI Renewable Energies has taken over the operations and maintenance (O&M) of the 85 MW De Aar 1 solar farm, which is located 500 km north of the coastal city of Port Elizabeth in South Africa.
The solar farm, the third largest under management by JUWI in the Europe, Middle East and Africa (Emea) region, was developed under Bid Window 1 of South Africa’s Renewable Energy Independent Power Producer Procurement Programme (REIPPPP).
It was commissioned for the South African grid in 2014 as Solar Capital De Aar 1 and was the largest solar project in that bid window.
"Renewable energy forms the backbone of President Cyril Ramaphosa’s energy crisis plan, and we’re committed to doing our part in providing the country with clean and renewable electricity, through the O&M of De Aar 1 and other JUWI utility-scale projects.
“Our goal is to operate De Aar 1 with the highest reliability and energy yield for the national grid. We’re honoured to have been entrusted with this critically important solar site; the award confirms our competence, dedication and commitment to providing O&M services that ensure that the grid in South Africa is provided with reliable renewable electricity,” says JUWI Emea O&M head Christos Charalampidis.
The De Aar 1 project adds to the JUWI South Africa portfolio of 400 MW installed solar, wind and hybrid renewable projects under operational management, and 5.5 GW globally.
With the acquisition of the De Aar 1 solar farm, JUWI increased its operational management portfolio in the Emea region to over 500 MW. This is the second third-party O&M facility that has been awarded to JUWI.
“JUWI is now expanding its focus, which historically centred on government procurement of utility-scale projects, such as those under the REIPPPP, to include the development and building of solar PV and hybrid energy solutions for mines and other energy-intensive users in Africa.
“Hybrid solutions include energy storage, which is essential to achieving energy resilience and reliability on the continent. We have a number of leading projects close to commission and in development,” says JUWI South Africa MD Richard Doyle.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation