Altus reports 'excellent' gold recoveries at Mali project
Mining royalty company Altus Strategies says it has recorded excellent gold recoveries from preliminary metallurgical testwork undertaken on composite samples of fresh rock collected from core drilling at the FT prospect at its Tabakorole gold project in southern Mali.
Exploration activities at Tabakorole are being funded by Marvel Gold under a joint venture (JV) with Altus.
Bottle roll tests on core samples from diamond drilling at the FT prospect indicate a straightforward, clean and nonrefractory ore with low reagent consumption, as well as high gold recoveries of 92.7% to 96.6% for grind sizes (P80) of 75 µ to 150 µ.
The project hosts a mineral deposit for which a mineral resource estimate (MRE) has been generated.
This comprises 16.6-million tonnes at 1.2 g/t gold for 620 000 oz in the inferred category and 7.3-million tonnes at 1.2 g/t gold for 290 000 oz in the indicated category.
Forty-three per cent of the current MRE is situated within 100 m of the surface.
The MRE is in accordance with the Joint Ore Reserves Committee code.
A 6 300 m resource expansion reverse circulation drilling programme is under way.
Meanwhile, Marvel has earned a 51% interest in the project and has paid Altus $200 000 in cash.
Marvel has started JV Stage 3 to earn an aggregate 70% by expending $3-million.
Altus holds a 2.5% net smelter return gold production royalty on Tabakorole.
"The results of the preliminary metallurgical testwork on fresh rock from drill core at the FT prospect of the Tabakorole project are excellent.
"Nonrefractory mineralisation with high gold recoveries highlights the potential for a simple, industry standard gold processing flow sheet. Future metallurgical testwork is expected to include potential optimisations of grind size and residence times,” says Altus CE Steven Poulton.
“Tabakorole currently hosts a significant gold resource which is open along strike in both directions, and at depth. The project is emerging as a significant West African gold deposit and these metallurgical testwork results represent a significant step in advancing the project,” he adds.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation