https://newsletter.en.creamermedia.com
Africa|Consulting|Design|Energy|Environment|Hydropower|Power|PROJECT|Projects|Renewable Energy|Renewable-Energy|Screening|Services|Solar|Environmental
Africa|Consulting|Design|Energy|Environment|Hydropower|Power|PROJECT|Projects|Renewable Energy|Renewable-Energy|Screening|Services|Solar|Environmental
africa|consulting-company|design|energy|environment|hydropower|power|project|projects|renewable-energy|renewable-energy-company|screening|services|solar|environmental

Environmental studies essential to REIPP success

NOT WINGING IT Embracing the advice given by professional environmental consultants early on can lead to the avoidance of many environmental issues

ACCOMMODATING NATURE Experienced specialists can ensure that environmental sensitivities are either avoided or mitigated to acceptable levels

13th December 2019

By: Darren Parker

Creamer Media Senior Contributing Editor Online

     

Font size: - +

In most renewable-energy independent power producer (REIPP) project cases, environmental sensitivities can be successfully avoided if developers embrace advice given by environmental consultants during the environmental-impact assessment (EIA) stage.

This enables developers to better ensure that their project implementation will be successful, claims environmental consultant Savannah Environmental director Jo-Anne Thomas.

In some instances, there are too many “red flags” after an EIA has been conducted, she points out. “In such cases, developers are at least able to discontinue site development with well-informed reasons why the site would not be viable for their project.”

Thomas advises that developers should begin their EIAs as soon as possible in the project development process. It is important to involve experienced specialists in this process to ensure that environmental sensitivities are either avoided as far as possible or mitigated to acceptable levels where avoidance is not possible.

She explains that the EIA process is largely informed by specialist studies that assess the project in detail. The decision-maker has to rely on and interpret the findings of the specialists involved in the EIA.

In many cases, there is no fine-scale mapping. Therefore, current data and findings for the project may differ in nature, extent or significance from the expectations created through a desk-top evaluation.

“There is much to be gained from using experienced specialists in the various disciplines to attain accurate findings and enable the environmental-assessment practitioner to draw a meaningful conclusion to the EIA study,” she notes.

Thomas says Savannah Environmental has seen changes in the regulatory framework for renewable-energy projects over the past 12 years, which has informed environmental best practice across the sector.

However, she notes that, as the regulatory environment changes, and as more knowledge is gained from the impacts of REIPP projects in South Africa on the environment, developers have to deal with more challenges.

For example, additional constraints may be imposed on a project for consideration in the final design phase.

“Developers are, however, aware of the risks that environmental challenges hold for their projects. There are many more developers embarking on screening processes to help identify these risks early on. Savannah Environmental supports this, and has always strongly advocated that developers follow this route,” she states.

Thomas adds that developers have learnt much regarding the mitigation of risks for successful projects, and about the EIA process through their being involved in the development of best practice guidelines and the renewable-energy development zones process.

Savannah Environmental has provided environmental consulting services for 41 of the preferred bidder projects throughout the various Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) windows. These projects include wind, solar photovoltaic, solar thermal, hydropower and biogas.

Of these, 14 have managed to be included in the REIPPPP fourth bid window.

Edited by Zandile Mavuso
Creamer Media Senior Deputy Editor: Features

Comments

Projects

Showroom

John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 
John Ratcliffe
John Ratcliffe

At John Ratcliffe, we are aftermarket specialists for heavy-duty on and off-road vehicles. We engineer and retrofit advanced safety systems, engine...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.228 0.33s - 210pq - 2rq
Subscribe Now