https://newsletter.en.creamermedia.com
Exploration|Gold|Mining|Power|PROJECT|Resources|Screening|transport|Maintenance|Power Generation|Power-generation|Infrastructure|Operations
Exploration|Gold|Mining|Power|PROJECT|Resources|Screening|transport|Maintenance|Power Generation|Power-generation|Infrastructure|Operations
exploration|gold|mining|power|project|resources|screening|transport|maintenance|power-generation|power-generation-industry-term|infrastructure|operations

Equus halts stockpile processing in Chile

17th October 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Equus Mining will suspend stockpile processing operations at its Cerro Bayo gold/silver project, in Chile, placing the processing infrastructure on care and maintenance.

The company on Monday said that this decision had been made after significant effort over the last few months to optimise the project to generate positive cashflow. Processing will continue over the next week as remaining relatively higher grade stockpile ore is fed to the processing plant.

The company told shareholders that preservation of capital and a focus on exploration for high potential targets, particularly advancing Equus’ success in exploring the Appaloosa Fault at Cerro Bayo, provided the best pathway to increased value for all stakeholders.

“The suspension of processing and continuing care and maintenance will result in the retrenchment of a significant proportion of our staff in Chile. This is very disappointing for Equus, and for the township community of Chile Chico where the majority of our staff are based,” the company said in a statement.

“We are very appreciative of the work of all our local staff, and hope that in the future many of them can be re-employed by Equus as part of a larger operation. Any staff being retrenched will receive 100% of their statutory benefits and accruals. We look forward to continued strong relations with the local community as we explore, creating the possibility for a long future for Equus in Chile Chico and long-term benefits for local stakeholders.”

Equus inherited the stockpile processing operation when it acquired Cerro Bayo in December 2021. While technically successful, with over 3 000 t of concentrates  shipped to customers, a combination of factors have made it no longer economically viable.

Equus noted that rising costs, particularly for fuel, made power generation and transport costs unsustainably high, and the addition of pre-screening to increase grades by circa 30% was not enough to overcome the increase in operating costs.

The processing of low-grade stockpiles since February 2021 has demonstrated that the processing plant and infrastructure is capable of consistently achieving nameplate throughput and high gold and silver recoveries even on low-grade stockpile ore. This supports the company’s view that when sufficient higher-grade resources are delineated at Cerro Bayo, Equus has full ownership of valuable and efficient processing infrastructure that can be readily brought back online.

Edited by Creamer Media Reporter

Comments

 

Showroom

Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.188 0.287s - 196pq - 2rq
Subscribe Now