https://newsletter.en.creamermedia.com
Africa|Construction|Design|Engineering|Fuchs Lubricants|Industrial|PROJECT|Storage|System|Systems
Africa|Construction|Design|Engineering|Fuchs Lubricants|Industrial|PROJECT|Storage|System|Systems
africa|construction|design|engineering|Fuchs-Lubricants|industrial|project|storage|system|systems

Fuchs Lubricants development project, South Africa – update

Image of new Fuchs warehouse

Image by Tasneem Bulbulia

20th May 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Fuchs Lubricants development project.

Location
Isando, Johannesburg, in Gauteng, South Africa.

Project Owner/s
Independent lubricant manufacturer Fuchs Lubricants South Africa, a subsidiary of Fuchs Petrolub.

Project Description
The Phase 1 involved the construction of a new office complex and new warehouse.

The office block comprises three floors with different department divisions, so-called hot seats for external sales representatives, several meeting areas, boardrooms, a multipurpose medical room, a canteen with indoor and outdoor seating, coffee and tea stations, as well as a rooftop entertainment area.

There is scope to increase the size of the office in the future, if required.

The new warehouse system will provide much-needed storage space and modernisation of systems, and enhance efficiencies for the company.

Phase 2 will comprise a new lubricants plant to bolster the company’s strong growth and expansion plans for the continent.

Potential Job Creation
Not stated.

Capital Expenditure
Phase 1 of the project will require an investment of about R250-million.

Phase 2 will cost about R500-million.

Planned Start/End Date
The warehouse construction took 15 months, starting in March 2021, while the office construction was an 11-month project, starting in June 2021. Fuchs officially launched its newly built head office and warehouse on May 13.

Latest Developments
Phase 1 of the project has been completed on time and within budget.

Construction of Phase 2 is under way, with design and conceptualisation completed and construction to begin in stages.

"We envisage to complete our investment in Phase 2 over the next five to ten years as economic conditions permit," MD Paul Deppe has indicated.

Key Contracts, Suppliers and Consultants
DRA Global (engineering, procurement and construction management); Industrial Logistic Systems (warehouse consultant); and ICM Architectural Studio (architect).

Contact Details for Project Information
Fuchs Lubricants South Africa, tel +27 11 565 9600.
NGAGE senior account executive Rachel Mekgwe, on behalf of Fuchs Lubricants South Africa, tel +27 11 867 7763  or email rachel@ngage.co.za.

Edited by Creamer Media Reporter

Comments

Showroom

BOVA Safety Wear
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (29/11/2024)
29th November 2024 By: Martin Creamer
Magazine video image
Magazine round up | 29 November 2024
29th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.215 0.365s - 194pq - 2rq
Subscribe Now