https://newsletter.en.creamermedia.com
Components|Dewatering|Electrical|Flow|Manufacturing|Rental|Water|Flow|Manufacturing |Bearings|Operations
Components|Dewatering|Electrical|Flow|Manufacturing|Rental|Water|Flow|Manufacturing |Bearings|Operations
components|dewatering|electrical|flow-company|manufacturing|rental|water|flow-industry-term|manufacturing-industry-term|bearings|operations

One-stop rental and rebuild solution provided

Image of pump set rebuilt by IPR

IPR recently completed the rebuild of a damaged pump set

23rd August 2022

     

Font size: - +

A pump rental company was recently able to provide a customer with a pump dewatering solution while also completing the rebuild of a damaged pump set for the same customer.

IPR operations manager Henru Strydom says that dealing with a pump rental company that has the expertise and capability to undertake a complete pump overhaul was a major advantage for this manufacturing sector customer. “Not only were we able to provide a rapid pump dewatering rental solution to this customer, we were also able to undertake the complete overhaul of the pump ensuring it was back in operation within a relatively short period of time,” he says.

Years of operation transferring water from one dam to another had taken its toll on the pump that was essential to the manufacturing operation. Strydom says that the damaged pump was removed from site and replaced with a rental unit. On further inspection, IPR found that the damage was both mechanical and electrical, and that a complete rebuild of the pump set would be essential to ensure reliable operation going forward.

The final overhaul saw all bearings replaced owing to excessive wear and a new engine wiring harness was installed to replace the old one which was damaged after short-circuiting. Other damaged components were also replaced, including the control panel.

The pump set components were spray painted in IPR’s in-house spray booth, before the pump was subjected to final quality control inspections and then tested in the company’s test tank. “Doing this gives our customer full assurance that the rebuilt pump set is capable of meetings its rated flow of 90 litres per second at a maximum head of 25 m,” Strydom says.

This is not the first full pump rebuild that IPR has done, and Strydom explains that having an in-depth understanding of pump applications and operations is an advantage especially when overhauling pump sets.

Comments

Showroom

Weir
Weir

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.147 0.25s - 279pq - 2rq
Subscribe Now