https://newsletter.en.creamermedia.com
Design|Gold|Modular|Testing
Design|Gold|Modular|Testing
design|gold|modular|testing

Akobo produces first concentrate from Segele plant

2nd August 2024

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Gold miner Akobo Minerals has successfully produced the first gold concentrate at its Segele processing plant, in Ethiopia.

The company started processing low-grade gold ore following a final phase of commissioning at the plant, which validated its functionality under operational conditions.

The company is testing and optimising the processing plant’s capabilities using low-grade ore, as part of its measured approach toward achieving full production from higher-grade ore.

The Segele site currently has an inferred and indicated mineral resource of 68 000 oz, yielding a significant grade of 22.7 g/t.

The plant is able to produce 4 000 oz of gold a month, at an expected recovery rate of 96%.

Its modular design allows for future upgrades as the Segele mine and other adjacent targets are developed, ensuring the plant remains adaptable to evolving operational needs.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.404 0.5s - 190pq - 2rq
Subscribe Now