https://newsletter.en.creamermedia.com

Cape Town completes bus depots for the new MyCiTi route

21st November 2025

     

Font size: - +

The City of Cape Town (CoCT) has completed the construction of two new MyCiTi bus depots as part of the new south–east route expansion that will link Khayelitsha and Mitchells Plain with Claremont and Wynberg.

Construction on the R430-million project started in August 2022.

The depots are located at the corner of Spine road and Mew way between Khayelitsha and Mitchells Plain. Each 7.5 ha in size, they will house the MyCiTi bus fleet that will operate on the south-east route expansion.

The initial capacity of up to 145 buses each can be scaled up to 250 buses.

The depots also house mechanical workshops, refuelling facilities, office space, a relaxation area for drivers, ablution facilities, as well as automated bus-cleaning equipment.

The depots were also developed with a move to electric buses in mind, with the underground infrastructure necessary for bus charging pre-installed.

“We are delighted that these completed depot projects exceeded their local job and small business targets, creating employment for close to 500 locals in Mitchells Plain and Khayelitsha, with 46 local subcontractors also working on the project,” notes CoCT Urban Mobility MMC Rob Quintas.

“The expansion of the MyCiTi service routes comes at an overall investment of R10-billion, the biggest in metro-led public transport by any South African city,” adds Cape Town Mayor Geordin Hill-Lewis.

Other infrastructure projects to support the MyCiTi route expansion include sky circle construction at Govan Mbeki road (M9) and Jan Smuts drive (M17); bridge construction over Duynefontein and Govan Mbeki roads; the construction of traffic lanes, bus stops, signalling and pedestrian and cycling lanes along Govan Mbeki road; bus lane construction along Turfhall road and AZ Berman; reconstruction of the westbound and eastbound lanes along Stanhope road, Imam Haron road (M24) and Chichester road, including turning lanes at Claremont boulevard, Palmyra road, Ravensworth road, Second Avenue/Livingstone road, Third Avenue and Doncaster road, and the widening of the Stanhope railway bridge.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Comments

Projects

Mercedes-Benz Wind Farm, Germany
Updated 2 hours 30 minutes ago By: Sheila Barradas

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Actom
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.215 0.31s - 183pq - 2rq
Subscribe Now