El-Dabaa nuclear power plant, Egypt – update


Name of the Project
El-Dabaa nuclear power plant (NPP).
Location
El-Dabaa, in Egypt, on the Mediterranean coast.
Project Owner/s
The Ministry of Electricity and Energy, represented by the Egyptian Nuclear Power Plant Authority (NPPA).
Project Description
El-Dabaa will be the first nuclear power plant in Egypt. The project will involve the construction of an NPP comprising four Russian-designed VVER-1200 pressurised water reactors.
With a nameplate capacity of 4.8 GWe, the plant is expected to account for up to 50% of Egypt’s power-generation capacity to meet the country’s increasing demand for electricity.
Potential Job Creation
More than 20 000 people are working at the construction site.
Capital Expenditure
Not stated.
Planned Start /End Date
Unit 1 started construction in July 2022 and Unit 2 in November 2022. Applications to build units 3 and 4 were submitted in January 2022. Unit 3 was awarded a construction licence in March 2023.
Egypt expects the plant to reach full capacity in 2030.
Latest Developments
The installation of the second tier of the inner containment building for the El Dabaa NPP’s second unit has been completed. Work was undertaken from February 16, 2025, to March 4, 2025.
The second tier of the cylindrical building, which houses the reactor and primary circuit equipment, comprises 12 segments, each 12 m long and 14 m high, and weighing more than 60 t. They were manufactured on site. When the inner containment is complete, it will be surrounded by a similar shaped, but larger, outer containment building with a domed roof.
Key Contracts, Suppliers and Consultants
Rosatom (pressurised water reactors); Atomenergomash and General Electric (turbine hall equipment); KHNP (construction of turbine islands); and Doosan Enerbility subcontractor – turbine islands).
Contact Details for Project Information
NNPA, tel +202 22616264 or email contact_us@nppa.gov.eg.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation