Enviro department evaluating EIAs for renewables projects with a combined capacity of 9 789 MW
Forestry, Fisheries and the Environment Minister Barbara Creecy reports that the department’s environmental impact assessment (EIA) section is currently processing applications for renewable-energy projects with a combined capacity of 9 789 MW.
Delivering her Budget Vote on May 19, the Minister said that there were application for 2 899 MW of solar photovoltaic capacity and a further 6 890 MW of wind capacity and added that many of the applications were coupled with battery energy storage systems and associated transmission and distribution infrastructure.
“We are working hard to cut the red tape and get these projects finalised and, in this regard, we have reduced our decision-making timeframes from 107 days to 57 days.”
Creecy reiterated the view that the country’s current lack of grid capacity was a major constraint in advancing the energy transition and said that adding additional transmission infrastructure had been set as a “national priority to solve” both for the transition and for tackling loadshedding in the short term.
“We have 15 EIA applications relating to transmission and distribution infrastructure which we are also prioritising for decision-making,” she revealed.
Commenting on the review under way regarding South Africa’s coal plant decommissioning schedule, Creecy said government did not view any possible delay as presenting a risk to meeting the country’s overall decarbonisation objectives.
“Government is clear that we must battle both loadshedding and climate change. It is not a one or the other decision.”
She said modelling was under way to provide guidance on how South Africa could “balance our decommissioning schedule so we can achieve energy security within the context of our climate change commitments and air quality improvement”.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation