https://newsletter.en.creamermedia.com
Engineering|Environment|Installation|PROJECT|Service|System|Terminals|Maintenance|Operations
Engineering|Environment|Installation|PROJECT|Service|System|Terminals|Maintenance|Operations
engineering|environment|installation|project|service|system|terminals|maintenance|operations

Gates in for the long haul at major airport

8th April 2025

     

Font size: - +

This article has been supplied.

Technicians responsible for airside operations at one of Germany’s leading airports have turned to Gates following a series of competitor hydraulic hose failures in passenger airbridges, leaving them unable to load or disembark passengers and crew.

The airport is now using Gates MegaSys™ hoses with a MegaTuff™ cover to replace failed competitor hoses, which have been prematurely breaking down.

Handling 60 million passengers and over 430,000 aircraft movements annually across three terminals, the airport can’t afford the operational disruption caused by these failures.

Hydraulic experts and Gates partner, Form-Plast GmbH, is conducting the replacement work, which includes removing the defective hose assemblies from the airbridge hydraulic system and performing a complete overhaul.

Form-Plast’s managing director, Andreas Held, noted the original hoses supplied with the airbridges were not durable enough to withstand typical operating conditions, which often include prolonged immersion in oil. Inspection revealed pinholes, cracks, and significant wear, rendering the airbridges out of service and disrupting airport operations.

Each overhaul requires between six and 15 hose assemblies, specific couplings, and careful routing to reduce stress under operating conditions.

This year alone, Form-Plast has replaced 24 airbridges. Reflecting on the project, Andreas Held commented: “The airport operators were concerned about the unexpected, premature failure of the original hoses before their six-year replacement schedule.

However, we have successfully allayed those fears with Gates hoses. Records from a previous Gates hose installation in 2018 proved that Gates hoses could perform reliably over time in this environment.”

Held added: “When a hydraulic failure occurs on an airbridge, the impact on operations is significant, leading to passenger delays and, more critically, potential damage to the aircraft. An airbridge unable to maintain the correct height during boarding or disembarking risks damaging the fuselage, particularly around the aircraft door.”

Gates MegaTuff hoses are exceptionally resistant to abrasion, oil, ozone, and UV exposure, due to the material science behind the specifically designed cover compound as well as the process engineering to ensure the cover remains intact and does not peel under demanding conditions. Importantly, they also maintain their flexibility and minimum bend radius, which simplifies installation and enhances durability.

The installations have demonstrated impressive performance with no leaks or defects, a result of Gates extensive research and development to create a seamless port-to-port solution. The hose and coupling combinations are designed to work seamlessly, offering trouble-free service throughout its working life, as Form-Plast’s experience confirms.

“By using Gates MegaSys MegaTuff hose assemblies, we have resolved these unexpected issues, eliminating airbridge failures and ensuring that they remain operational for the six-year window, keeping operations running and reducing the airport operator’s maintenance costs in the long term,” concluded Held.

Edited by Creamer Media Reporter

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

UP showcases mining VR centre
UP showcases mining VR centre
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.154 1.466s - 175pq - 2rq
Subscribe Now