https://newsletter.en.creamermedia.com
Consulting|Design|Exploration|Gold|Infrastructure|Mining|Resources|Road|Services|srk|SRK Consulting|Systems|Underground|Maintenance|Drilling|Infrastructure
Consulting|Design|Exploration|Gold|Infrastructure|Mining|Resources|Road|Services|srk|SRK Consulting|Systems|Underground|Maintenance|Drilling|Infrastructure
consulting-company|design|exploration|gold|infrastructure|mining|resources|road|services|srk|srk-consulting|systems|underground|maintenance|drilling|infrastructure

Gold Road sees multi-decade potential in Gruyere

8th April 2025

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Australian miner Gold Road Resources has outlined the underground potential of the Gruyere gold mine in Western Australia, pointing to a conceptual resource of up to 1.5-million ounces and committing A$26.4-million to drilling to support a future prefeasibility study.

The company, which operates Gruyere in a 50:50 joint venture with Gold Fields, reported on Tuesday that it had received the results of a scoping study prepared by SRK Consulting, presenting a sub-level caving development option based on a A$2 240/oz gold price. The study confirms the technical and economic viability of transitioning the openpit mine into a large-scale underground operation.

Gold Road estimates an underground exploration target of 25-million to 31-million tonnes at grades ranging from 1.20 g/t to 1.47 g/t gold, for between 1-million and 1.5-million ounces on a 50% basis. The target is in addition to Gruyere’s existing mineral resource of 45-million tonnes at 1.51 g/t gold (2.2-million ounces, 50% basis) outside the current ore reserve.

“This underground mining potential has the ability to transform Gruyere into a multi-decade life mine,” said Gold Road MD and CEO Duncan Gibbs. “The results take us another step closer to realising the long-term value of this operation.”

Initial capital investment for underground infrastructure is estimated at A$470-million, rising to A$588-million including contingency and additional development costs on a 100% basis. Planned infrastructure includes bulk material handling systems, ventilation, maintenance, and services.

The JV has launched a 60 000-m drill campaign, targeting mineralisation as deep as 700 m below the final openpit design. Drilling is expected to continue through mid-2026, with aims to convert the deeper portion of the orebody to an Inferred Resource and upgrade shallower zones to Indicated status.

A PFS is planned once the drill program is complete and sufficient confidence is built in the underground model.

Gruyere, located about 200 km east of Laverton, poured first gold in 2019 and has produced more than one-million ounces to date.

The announcement comes just weeks after Gold Road rebuffed a takeover proposal from Gold Fields. The unsolicited bid, pitched at A$2.27 a share in cash plus a variable component tied to Gold Road’s stake in De Grey Mining, was unanimously rejected by Gold Road’s board as undervaluing the company and arriving at an “opportunistic” time.

Gold Road chairperson Tim Netscher said Gold Fields’ subsequent refusal to sell its own 50% interest in Gruyere at the same implied valuation highlights the long-term value both parties see in the asset.

Edited by Creamer Media Reporter

Comments

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (11/04/2025)
11th April 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.115 0.213s - 172pq - 2rq
Subscribe Now