https://newsletter.en.creamermedia.com
Components|Concrete|Construction|Generators|Power|PROJECT|Roads|Surface|Voith
Components|Concrete|Construction|Generators|Power|PROJECT|Roads|Surface|Voith
components|concrete|construction|generators|power|project|roads|surface|voith

Grand Ethiopian Renaissance Dam, Ethiopia – update

Image of Ethiopia map/flag

28th February 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Grand Ethiopian Renaissance Dam (GERD).

Location
On the Abay river, in the Beneshangul Gumuz region of Ethiopia.

Project Owner/s
Ethiopian Electric Power Corporation (EEPCo).

Project Description
The project envisages a plant with an installed capacity of 6 000 MW that will supply 15 692 GWh/y.

The major components of the project include:

  • a 145-m-high, roller-compacted-concrete (RCC) dam with a 1 780-m-long crest;
  • a rock-filled saddle dam, 4 800 m long and 45 m high, with a bituminous surface facing;
  • two outdoor powerhouses of 3 750 MW and 2 250 MW installed capacity, containing ten and six generating units respectively, each with a capacity of 375 MW; and
  • a 500 kV switchyard, which will transmit power from the two powerhouses to the grid.

The main dam and saddle dam will create 74-billion cubic metres of impounding capacity, with a surface area of 1 680 km2 at full capacity.

A gated spillway, equipped with six radial gates and a discharge capacity of 14 700 m3/s at probable maximum flood occurrence, will be located on the left side of the main dam.

A saddle dam on the left side of the RCC dam, with an emergency side spillway, is envisaged to allow for the discharge of floodwater directly into the Roseires reservoir.

The construction of 123 km of access roads, as well as camps, workshops and other civil works, forms part of the activities for the project.

Potential Job Creation
Not stated.

Capital Expenditure
The project is valued at $4.8-billion.

Planned Start/End Date
The project started construction in 2011 and faced many delays. It is expected to be completed in 2023, barring any further delays.

Latest Developments
GERD has reached another milestone with the successful activation of its fifth operational turbine, Construction Review Online has reported. 

According to project officials, Unit 6 has started generating electricity following a series of precommissioning tests. 

In addition to Unit 6, Turbine No 5 is in its final commissioning phase. This will also be operational soon. 

Units 7 and 8 are already in operation.

Key Contracts, Suppliers and Consultants
Salini Costruttori, a subsidiary of Salini Impregilo; GE Hydro France; China Gezhouba Group Corp; Voith Hydro Shanghai and China's Sinohydro Corp (construction contract); and Alstom (turbine and generators).

Contact Details for Project Information
EEPCo, tel +251 11 1 55 95 67, fax +251 11 1 57 1860 or email eepcocommunication@yahoo.com.

Edited by Creamer Media Reporter

Comments

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (21/02/2025)
21st February 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.117 0.269s - 171pq - 2rq
Subscribe Now