https://newsletter.en.creamermedia.com
Africa|Construction|Design|Energy|Engineering|Financial|Gas|Industrial|Infrastructure|Manufacturing|Power|PROJECT|Renewable Energy|Renewable-Energy|Solar|Infrastructure
Africa|Construction|Design|Energy|Engineering|Financial|Gas|Industrial|Infrastructure|Manufacturing|Power|PROJECT|Renewable Energy|Renewable-Energy|Solar|Infrastructure
africa|construction|design|energy|engineering|financial|gas|industrial|infrastructure|manufacturing|power|project|renewable-energy|renewable-energy-company|solar|infrastructure

Green hydrogen project, South Africa – update

Image of hydrogen molecules

1st August 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Green hydrogen (GH2) project.

Location
Near Vanrhynsdorp, in South Africa’s Western Cape province.

Project Owner/s
Global energy company Keren Energy.

Project Description
The project received Strategic Infrastructure Project status from Infrastructure South Africa in 2023 and involves the construction of a GH2 production facility.

It will support South Africa’s transition to a low-carbon economy by focusing on small-scale, distributed hydrogen production, tailored for the local industrial, manufacturing, mobility and commercial sectors. 

The facility will produce an estimated 800 t/y of green hydrogen in the first phase.

It will use on-site solar power, supplemented by grid-based renewable energy, to power advanced electrolysers, which produce green hydrogen in gas form.

The hydrogen will be stored in ISO tube trailers, allowing for flexible, decentralised distribution to end-users.

The project aims to mitigate the impact of mechanisms, such as the EU Carbon Border Adjustment Mechanism, and support the competitiveness of South African exporters.

Potential Job Creation
The project aims to create local jobs and foster skills development.

Capital Expenditure
The total investment required for the project’s full development is estimated at R1-billion.

Planned Start/End Date
The project is expected to reach financial close by the end of 2025, with production anticipated to start in the first half of 2028.

Latest Developments
Keren Energy has made significant progress in the development of its GH2 production facility.

The front-end engineering design study and bankable financial model for the project have been completed, with most of the permits in place.

The project site has also been secured through a long-term lease.

Keren Energy CEO George van Rensburg said in May 2025 that the company’s current priority was engaging with potential offtakers, businesses and sectors seeking to decarbonise through access to green hydrogen. 

“We are also in discussions with investors and funding institutions to support the development,” he added.

Key Contracts, Suppliers and Consultants
Not disclosed.

Contact Details for Project Information
Keren Energy email info@kerenenergy.com.
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Latest News

Wind turbines and solar panels
Egypt signs renewable energy deals worth $1.8bn
Updated 2 hours 52 minutes ago By: Reuters

Showroom

SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/12/2025)
12th December 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.243 0.411s - 191pq - 2rq
Subscribe Now