https://newsletter.en.creamermedia.com
Africa|Construction|Energy|Engineering|Power|PROJECT|Renewable Energy|Renewable-Energy|Resources|Services|Storage|System|Systems|Maintenance|Operations
Africa|Construction|Energy|Engineering|Power|PROJECT|Renewable Energy|Renewable-Energy|Resources|Services|Storage|System|Systems|Maintenance|Operations
africa|construction|energy|engineering|power|project|renewable-energy|renewable-energy-company|resources|services|storage|system|systems|maintenance|operations

Haru battery energy storage system project, South Africa

Image of BESS

25th July 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Haru battery energy storage system project (BESS).

Location
Free State, in South Africa.

Project Owner/s
Norwegian renewable-energy systems company Scatec will own 50.01% of the equity in the project, with Stanlib’s Greenstreet and Redstreet Funds owning 44.99% and a community trust holding 5%.

Project Description
Scatec was chosen as the preferred bidder for the development of a 123 MW/492 MWh BESS in Bid Window 3 of the Department of Mineral Resources and Energy’s Battery Energy Storage Independent Power Producer Procurement Programme, or BESIPPPP, in May 2025.

Potential Job Creation
Not stated.

Capital Expenditure
Capital expenditure is estimated at R2.2-billion. The project will be financed by 90% nonrecourse project debt and the balance by equity from the owners.

Planned Start/End Date
Commercial close is expected to be concluded by the end of the first quarter of 2026.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Scatec (engineering, procurement and construction, operations and maintenance, and asset management services).

ontact Details for Project Information
SVP External Affairs & Communications Meera Bhatia, tel +47 468 44 959 or email meera.bhatia@scatec.com.
Scatec, tel +47 480 85 500 or email post@scatec.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Projects

Image of kelp
Alginate production plant, South Africa
Updated 2 hours 27 minutes ago By: Sheila Barradas
Proposed location of the Nordenham Solar Plant
Nordenham Solar Plant, Germany
Updated 2 hours 27 minutes ago By: Sheila Barradas

Showroom

Carlisle TyrFil
Carlisle TyrFil

Flatproofing tire technology engineered to perform in extreme mining environments.

VISIT SHOWROOM 
Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (05/09/2025)
5th September 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.088 0.235s - 192pq - 2rq
Subscribe Now