https://newsletter.en.creamermedia.com
Africa|Coal|Construction|Engineering|Export|Financial|Gas|PROJECT|Resources|Sustainable|Systems|Technology|Training|Waste|Water|Waste
Africa|Coal|Construction|Engineering|Export|Financial|Gas|PROJECT|Resources|Sustainable|Systems|Technology|Training|Waste|Water|Waste
africa|coal|construction|engineering|export|financial|gas|project|resources|sustainable|systems|technology|training|waste-company|water|waste

Hiryo coal-to-fertiliser and methanol project, South Africa – update

Image of fertiliser

1st August 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Hiryo coal-to-fertiliser and methanol project.

Location
Kriel, in Mpumalanga, South Africa.

Project Owner/s
South African company specialising in blue ammonia production SUISO.

Project Description
The facility aims to produce 1.5-million tons of nitrogen-based fertilisers a year, which will significantly reduce reliance on imported fertilisers. Output will include urea, ammonia nitrate and controlled-release variants.

SUISO plans to establish a blue ammonia production facility with a capacity of 2 200 t/d. This facility will produce about 2 600 t/d of urea, 1 600 t/d of ammonium nitrate and a low-density ammonium nitrate using prilling technology, with any excess ammonia being sold in bulk.

The project will use advanced carbon capture and utilisation systems to significantly reduce emissions. Captured carbon will be repurposed for gypsum and ammonium carbonate production, consequently converting waste into valuable resources for agriculture and construction. 

It will also implement wet flue gas desulphurisation and advanced water recycling systems to meet international emission standards. These technologies will reduce nitrogen and sulphur dioxide emissions, addressing long-standing air-quality concerns in Mpumalanga. 

Further, the production of 234 000 t/y of clean, zero-sulphur blue methanol will ensure compliance with South Africa’s upcoming Fuel Act of 2027.

Potential Job Creation
About 4 000 jobs will be created during construction, transitioning to 981 permanent positions once fully operational. To build a skilled workforce, the on-site Gerhard Potgieter Engineering Training College will upskill 400 employees, fostering sustainable development and economic resilience in Mpumalanga.

Capital Expenditure
$1.7-billion.

Planned Start/End Date
The project is expected to be fully operational in 2029.

Latest Developments
The African Export-Import Bank Advisory and Capital Markets department has been appointed and mandated as the exclusive financial adviser to raise capital for the project.

The department’s role will be to leverage its network and expertise to structure and mobilise the capital required for project execution.

Key Contracts, Suppliers and Consultants
Sinopec Ningbo Engineering and Stamicarbon (engineering partners).

Contact Details for Project Information
SUISO, email info@suiso.co.za.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Showroom

MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 
Amsted Reelin image
Amsted Reelin

REELIN is Currently the largest supplier of Bearings to Transnet. We have contracts to supply bearings, draft gears slackadjusters and other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 14 November 2025
Magazine round up | 14 November 2025
14th November 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.201 0.369s - 190pq - 2rq
Subscribe Now