https://newsletter.en.creamermedia.com
Africa|Coal|Design|Efficiency|Installation|OPENCAST|Steel|Technology|Weir Minerals Africa
Africa|Coal|Design|Efficiency|Installation|OPENCAST|Steel|Technology|Weir Minerals Africa
africa|coal|design|efficiency|installation|opencast|steel|technology|weir-minerals-africa

Hydrocyclone boosts coal plant performance

Cavex hydrocyclones are available in a range of sizes

Cavex hydrocyclones are available in a range of sizes

20th February 2020

     

Font size: - +

A colliery in Mpumalanga is said to have achieved improved yields and production throughput with the installation of a new hydrocyclone.

The opencast coal mine was looking to improve the performance of its dense media separation (DMS) circuit in its wash plant 1. The existing 610 mm cyclone, installed during the mine’s initial design phase, had an operational life of only six months between refurbishments and a site audit revealed that the existing cyclone was operating inefficiently.

A wash-ability analysis showed that an improved yield could be achieved using new hydrocyclone technology on the DMS circuit. The customer specified that product was required to offer improved separation efficiency, increase wear life and match the existing cyclone footprint.

Following a proposal that included dense media (DM) hydrocyclone simulations, a Cavex 500CVXT20 DM hydrocyclone was installed at Yoctolux Collieries in Mpumalanga in August 2017. To date, the hydrocyclone is said to have achieved higher separation efficiency through an average 15% yield increase. It has achieved an overall average of 75% yield for both of the mine’s coal types – grains and peas. This compares favourably to the 65% achieved previously by the competitor’s cyclone.

Manufactured from mild steel, the hydrocyclone from Weir Minerals Africa is lined with 25 mm slip-casted radius ceramic tiles manufactured with 92% alumina content.

The mine reports a 49% throughput increase in production tonnage, from 78 t/h to 116 t/h as a result of the reduced turbulence in the hydrocyclone’s design. An improvement in wear life has also been noted, with the new hydrocyclone requiring only a spigot replacement after nine months.

The colliery placed an order for an additional Cavex 500CVXT20 DM hydrocyclone in May 2018, to replace the existing cyclone on wash plant 2.

Comments

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 08 November 2024
Magazine round up | 08 November 2024
8th November 2024
Value-adding titanium dioxide pigment under development
Value-adding titanium dioxide pigment under development
6th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.143 0.252s - 277pq - 2rq
Subscribe Now