https://newsletter.en.creamermedia.com
Construction|Engineering|Fabrication|PROJECT|Shell|ThyssenKrupp|transport|Water
Construction|Engineering|Fabrication|PROJECT|Shell|ThyssenKrupp|transport|Water
construction|engineering|fabrication|project|shell|ThyssenKrupp|transport|water

Hydrogen Holland I, the Netherlands

Periodic table symbol for hydrogen

28th January 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Hydrogen Holland I.

Location
Port of Rotterdam, the Netherlands.

Project Owner/s
Oil industry company Shell.

Project Description
The project requires the engineering, procurement and fabrication of a 200 MW electrolysis plant, based on thyssenkrupp Uhde Chlorine Engineers’ large-scale 20 MW alkaline water electrolysis module.

The centre of the hydrogen project facility will be a hall, covering 2 ha, the size of three football fields. Green hydrogen will be produced for industry and the transport sector, with electricity supplied from the offshore Hollandse Kust (Noord) Wind Farm using guarantees of origin.

Potential Job Creation
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Shell’s final investment decision to build the ‘Holland Hydrogen I’ is expected in 2022, whereafter construction for the electrolysers will likely begin. The facility is scheduled to start production in 2024.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Shell, tel +44 207 934 5550.

Edited by Creamer Media Reporter

Comments

Showroom

AQS Liquid Transfer
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (06/06/2025)
6th June 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.148 0.304s - 188pq - 2rq
Subscribe Now