https://newsletter.en.creamermedia.com
Construction|Fluor|PROJECT|Roads|Safety
Construction|Fluor|PROJECT|Roads|Safety
construction|fluor|project|roads|safety

Interstate 35 Capital Express South project, US

Image of US map/flag

11th November 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Interstate 35 (I-35) Capital Express South project.

Location
Austin, Texas, in the US.

Project Owner/s
Texas Department of Transportation (TxDOT).

Project Description
The I-35 through Austin is one of the most travelled interstates in Texas and serves more than 150 000 vehicles a day.

The estimated 15 km project will add two nontolled, high-occupancy-vehicle lanes in each direction along I-35, from US 290 West/State Highway 71/Ben White Boulevard to State Highway 45 Southeast.

The project includes a combination of at-grade and elevated lanes in the median, the recon­struction of bridges and frontage roads, the addition of a shared-use pedestrian and bicycle path, as well as enhanced safety and mobility improvements.

Potential Job Creation
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Construction is scheduled to begin in late 2022, with substantial completion expected in late 2027.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Fluor Corporation (construction contract).

Contact Details for Project Information
TxDOT, tel +1 512463 8588.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.13 0.278s - 172pq - 2rq
Subscribe Now