https://newsletter.en.creamermedia.com
Botswana|Copper|Exploration|PROJECT|Resources|Systems
Botswana|Copper|Exploration|PROJECT|Resources|Systems
botswana|copper|exploration|project|resources|systems

Kavango encouraged by Botswana exploration progress

18th August 2025

By: Tasneem Bulbulia

Deputy Editor Online

     

Font size: - +

London-listed Kavango Resources is encouraged by a recently completed ground geophysical programme at the company’s Karakubis copper project, in Botswana’s Kalahari Copper Belt (KCB), part of its 6 200 km2 KCB mineral rights package.

In collaboration with TSX-listed First Quantum Minerals, Kavango gathered additional controlled-source audio-frequency magnetotelluric and induced polarisation data along a section line located over First Quantum’s deep (1 266.40 m) mineral systems exploration hole.

This has provided Kavango with access to important drill core, across the key target horizon for copper/silver mineralisation in the KCB, the company highlights, adding that such physical data acts as a crucial control for interpretation of geophysical survey data to identify higher-confidence drill targets.

Kavango’s team has now spent six months improving its interpretation of geophysical survey data taken over recent years at Karakubis to develop a target model for discovery of potential Tier 1 copper/silver mineralisation.

The company says it is encouraged by the results of this and is currently preparing final targets for a follow-up drill programme later this year.

“We are applying sophisticated targeting techniques that are delivering promising results, as this recently completed comprehensive and integrated geophysical programme shows. The geophysics is allowing us to develop further our understanding of previous drill results.

“New interpretations are developing answers to a variety of key questions on the structural architecture and potential for the southern margin of the KCB to host large Tier 1 deposits. Results from this important phase of work will be used to refine our geophysics driven targeting strategy,” CEO Ben Turney says.

“Karakubis is an extremely large project that appears increasingly prospective for large-scale copper deposits. These technical steps are important for our team’s understanding of the stratigraphy of the Karakubis area and are critical stage gates on our path towards commercial discovery,” he adds. 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest News

An Aspen production facility
Aspen warns of lower full-year earnings
22nd August 2025 By: Schalk Burger

Showroom

SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 
Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 22 August 2025
Magazine round up | 22 August 2025
22nd August 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.138 1.429s - 184pq - 2rq
Subscribe Now