https://newsletter.en.creamermedia.com

Kennecott solar plant, US – update

Image of solar panel system

30th January 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kennecott solar plant.

Location
Utah, in the US.

Project Owner/s
Global mining group Rio Tinto.

Project Description
On November 13, 2024, Rio Tinto approved the construction of a new 25 MW solar plant at the Kennecott mine, bringing the mine’s total solar capacity to 30 MW.

The 85 ha solar array will include more than 71 000 panels, which will contain tellurium produced by Kennecott, a byproduct of mining and refining copper. 

The new solar plant will be built adjacent to Kennecott’s existing 5 MW solar plant, which was completed in 2023. 

The two solar plants will reduce Kennecott’s Scope 2 emissions by about 6%, or about 21 000 t/y of CO2 equivalent.

Potential Job Creation
The project will create short-term employment for up to 100 labourers, as well as a small number of long-term operations and maintenance roles.

Capital Expenditure
None stated.

Planned Start/End Date
Construction of the plant started in October 2024. The project was completed and commissioned in October 2025 and was energised in December.

Latest Developments
Rio Tinto has commissioned the 25 MW solar plant.

Key Contracts, Suppliers and Consultants
Bechtel Corporation (design and construction management of the plant).

Contact Details for Project Information
Rio Tinto, email media.enquiries@riotinto.com.
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Projects

Image of South Africa map/flag
Small Harbours Programme, South Africa
Updated 2 hours 20 minutes ago By: Sheila Barradas
Image of wastewater treatment works
Wildevoëlvlei WWTW upgrade, South Africa
Updated 2 hours 20 minutes ago By: Sheila Barradas

Showroom

Iritron
Iritron

Iritron delivers advanced automation, control, and optimisation solutions to the Mining, Minerals & Metals, Consumer Package Goods and...

VISIT SHOWROOM 
Monitor Distributors
Monitor Distributors

We at Hawk High Pressure Pumps specialise in industrial pumps and pumping systems. Our high pressure washing equipment is locally manufactured and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.15 0.255s - 187pq - 2rq
Subscribe Now