Lotus confirms significant uranium potential in updated Letlhakane MRE
ASX-listed Lotus Resources has published a revised mineral resource estimate (MRE) of 155.3-million tonnes, grading 345 parts per million (ppm) triuranium octoxide (U3O8), for the Letlhakane uranium project, in Botswana.
This means the project can deliver 80-million pounds of recovered uranium over its life, based on a 70% recovery rate, the company says.
The revised MRE is constrained by pit shells, demonstrating reasonable prospects of eventual economic extraction and is based on a 200 ppm cut-off grade.
The company says the revised MRE establishes Letlhakane as a large and attractive standalone development project, which, together with its Kayelekera project, in Malawi, can position the company as a globally significant uranium producer.
Lotus reports the Letlhakane resource scale and production potential is in line with other ASX-listed companies’ primary uranium assets, including Deep Yellow’s Tumas project and Bannerman Energy’s Etango project.
Based on higher cut-off grades, there is potential for mining to target even higher-grade portions of the deposit in the early years of its operation.
The revised MRE will support Lotus’ proposed mining studies and metallurgical testwork.
The company plans to publish a scoping study on the project in the last quarter of this year.
“Since completing the acquisition of Letlhakane last year, we have spent considerable time assessing more than a decade’s worth of historical work completed on the site.
“This analysis has resulted in the project’s potential significantly exceeding our initial expectations, with it clearly having the capacity to be a major uranium-producing asset for a long time,” says Lotus MD Keith Bowes.
Meanwhile, the Kayelekera project is on track for restarted uranium production late in 2025.
By combining the two assets, Lotus can potentially produce more than six-million pounds of U3O8 a year.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation