https://newsletter.en.creamermedia.com
Africa|Building|Components|Container|Energy|Engineering|engineering news|Hydropower|Installation|Power|PROJECT|Projects|Renewable Energy|Solar|Storage|Systems|Technology|Equipment|Infrastructure
Africa|Building|Components|Container|Energy|Engineering|engineering news|Hydropower|Installation|Power|PROJECT|Projects|Renewable Energy|Solar|Storage|Systems|Technology|Equipment|Infrastructure
africa|building|components|container|energy|engineering|engineering-news|hydropower|installation|power|project|projects|renewable-energy|solar|storage|systems|technology|equipment|infrastructure

Madagascar solar roll-out to address access issues, reduce fossil fuel dependency

18th August 2020

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

Renewable energy, real estate and free zone project developer Groupe Filatex is rolling out a series of renewable energy power projects in Madagascar in partnership with Canada-based energy development company Dera Energy as part of its efforts to address a dire electricity deficit, increase access to electricity by the country’s majority rural population and reduce the country’s historic reliance of carbon-intensive fossil fuels.

The company is also developing 66 MW worth of solar photovoltaic (PV) projects in Côte d'Ivoire at a cost of €80-million; 10 MW of solar PV and 33 MW worth of hydropower in Guinea, at a cost of €8.5-million and €105-million, respectively; 20 MW worth of solar PV in Ghana at a cost of €17-million; and is in advance negotiations to acquire an 8 MW hydropower plant in the Balkans with an expansion to reach 14 MW at a cost of €35-million.

Madagascar is faced with a dire shortage of electricity, with only about a quarter of the population having access to electricity.

The situation is further exacerbated because as much as 80% of the population (about 20-million people) live in a rural setting, of which only 5% is electrified.

Further, access to electricity in rural settings is often limited to short evening peaks when small-scale fossil-fuel burning plants operate, selling power at high prices of about €0.55/kWh – equivalent to about R11.36/kWh as at August 14.

Groupe Filatex COO George Conde says the Madagascar government has ambitious plans to switch from fossil-dependent power production to cleaner forms of energy.

In Madagascar, the company is rolling out three types of solar PV projects – hybrid plants that supplement existing heavy fuel oil (HFO) generation plants, mobile container-mounted units and ground-mounted solar PV plants.

The mobile units were built to showcase Groupe Filatex’s versatility in developing various types of plants, as well as to have the ability to move them in an emergency situation.

He tells Engineering News that the company has been in the energy production sector of Madagascar for about 12 years. Initially, the company was focused on fossil-fuel powered plants, with an emphasis on HFO generation, but redirected its focus about two years ago to renewable energy projects instead.

By the end of 2021, Groupe Filatex will be providing green electricity to over one-million households.

Its projects are in the form of primarily solar-grid-connected PV projects.

In urban areas with existing grid connectivity, Groupe Filatex is connecting its commissioned plants to the grid, selling its power to State-owned power utility Jirama.

In rural areas with poor or nonexistent grid connectivity, Groupe Filatex is developing minigrid infrastructure and for some of these towns, selling power directly to the end-user, thereby electrifying previously dark areas.

By the end of 2021, Groupe Filatex expects to have solar PV projects in locations providing electricity to the cities of Tamatave, Tulear, Diego, Majenga, Nosy Be, and the capital Antananarivo.

As a whole, the company plans to roll out as much as 280 MW in renewable energy, including 170 MW in Madagascar and 110 MW in other parts of Africa.

Currently, Groupe Filatex also has 102 MW worth of HFO generation assets in Madagascar.

Conde says that Madagascar is developing two big hydropower projects, adding however, that these take a long time to develop.

“So the country needs this period of transition with solar to be able to quickly provide additional power into the grid, but at the same time to have them come from renewable energy.”

With a strategy to expand regional renewable energy in mind, he tells Engineering News that Groupe Filatex currently has about 170 MW of solar PV projects in development. These projects were started early in 2019 with site preparations, while installation of modules and other equipment got under way towards the end of 2019.

In July this year, Groupe Filatex commissioned its first kilowatts to the national grid, providing additional power to the city of Tamatave. “By the end of August, we will have a total of 2 MW in production. If it was not for Covid-19, we would have had 2.9 MW in production in Tuléar as well.”

Further, some of Groupe Filatex’s solar PV projects incorporate battery storage components to provide power 24/7 with renewable energy. On such instance is the company’s building of a 10 MW rooftop installation at its free zone in Antananarivo, as well as a 20 MW project in Ghana, and 10 MW in Guinea due to come on line in 2021.

The company is also rolling out several 100 kW to 750 kW minigrid independent power systems in rural Madagascar, with projects totalling 14 MW. These systems will be completely autonomous with battery storage technology and deliver electricity to the national offtaker and in some cases directly to the end-user.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

 
 

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.23 0.324s - 196pq - 2rq
Subscribe Now