Meliadine extension project should not be allowed – Nunavut board
The extension project for the Meliadine mine, owned by Agnico Eagle, should not proceed, owing to the uncertainty of the potential for negative, lasting effects on caribou, the Nunavut Impact Review Board (NIRB) has said.
The project would extend the Meliadine mine’s life by 11 years to 2043.
Agnico Eagle has proposed extending the openpit access for specific targets to underground mining access and developing additional infrastructure and portals to support the additional access.
The miner also planned a wind farm, including 11 turbines. The NIRB said that, although community members were generally supportive of Agnico Eagle finding alternative energy sources, they opposed the proposed location of the wind farm, citing concern about the impact on caribou.
The NIRB said it recognised the support in the Kivalliq communities for the economic benefits of extending the mine life, but found that there was considerable uncertainty in relation to the scope and effects that the proposed intensification of activities would have on the movement, abundance and health of Qamanirjuaq caribou herd, air quality, water quality in the Meliadine Lake and Itivia harbour and health, livelihood, culture and traditional land use of people in the region.
The board also said there were high levels of uncertainty as to whether existing modified mitigation measures would be sufficiently protective to prevent or manage negative effects from the extension proposal on caribou.
The Meliadine mine, which is forecast to produce 365 000 oz this year, is located near the western shore of Hudson Bay in the Kivalliq district of Nunavut, about 25 km north of Rankin Inlet and 290 km southeast of our Meadowbank mine.
Meliadine includes seven gold deposits, six of which are part of the current mine plan, extending to 2032. The 98 222-ha property covers an 80-km-long greenstone belt.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation