https://newsletter.en.creamermedia.com
Business|Construction|Exploration|Gold|Mining|PROJECT|Proximity|Drilling|Operations
Business|Construction|Exploration|Gold|Mining|PROJECT|Proximity|Drilling|Operations
business|construction|exploration|gold|mining|project|proximity|drilling|operations

Montage Gold awarded new exploration permits in Côte d’Ivoire

Gold bars

Photo by Bloomberg

17th December 2025

By: Sabrina Jardim

Senior Online Writer

     

Font size: - +

TSX-listed Montage Gold has been awarded two new exploration permits in Côte d’Ivoire , strategically increasing its Koné gold project land package and adding to the highly prospective Wendé advanced greenfield exploration property.

Montage notes that the Koné project land package has increased by 381 km2 to 1 699 km2 following the grant of the Gbatosso exploration permit (PR0875). The permit is located in a highly prospective area along the continuity with the Lokolo and Yeré trends and is within trucking distance to the Koné processing plant.

In addition, Montage says it has been granted the Wendé permit (PR1044), covering an area of about 107 km2, located along the Ouango-Fitini shear zone in close proximity to several other significant gold mining operations and deposits.

The company explains that historical workings on the property highlight a significant 7 km2 gold-in-soil anomaly with assays grading over 100 ppb.

Exploration activities on the Wendé property are set to begin in early 2026 and will include geochemical and geophysical surveys, as well as exploration drilling of prospective targets.

“We are delighted to be granted additional exploration permits in Côte d’Ivoire which both strategically expands our land package along the Koné project and adds the highly prospective Wendé advanced greenfield exploration property,” says CEO Martino De Ciccio.

“Moreover, it reflects the strong support we continue to receive from our local stakeholders as we strive to position Montage as the partner of choice through our win-win approach and strong focus on local content”.

With construction at the Koné project rapidly advancing, remaining on-budget and well on-schedule, De Ciccio says the company is well positioned to unlock significant exploration value by leveraging its extensive technical expertise and established presence in the region.

He adds that the recently announced acquisition of ASX-listed African Gold will bring the high-quality resource-stage Didievi project, which is expected to provide near-term growth, while the recently granted Wendé property provides the potential to source the next project organically.

“We are very pleased with the momentum generated across the business as we continue to execute on our strategy of creating a premier multi-asset African gold producer and delivering value for all our stakeholders,” says De Ciccio.

“We are very pleased to have secured the Gbatosso permit given its highly strategic positioning within the Koné project as the Lokolo trend and Yeré trend, which are both known to host significant gold mineralisation as demonstrated with our recent drilling campaigns, are known to extend into the Gbatosso permit,” adds Montage exploration executive VP Silvia Bottero.

“We continue to be very excited with the exploration potential at our Koné project and look forward to continuing to deliver strong resource growth next year, including a maiden resource for the recently announced Petit Yao discovery where drilling is now intensifying”.

Further, Bottero notes that the awarding of the Wendé advanced greenfield exploration permit marks a milestone in Montage’s exploration strategy, as the company advances its objective of creating a multi-asset exploration pipeline by sourcing future proejcts organically through and in-house staking and exploration grounds.

“Wendé is located on a major gold mineralised and structurally important trend where historical exploration work on the property confirmed its prospectivity. As such, we look forward to commencing our exploration work at Wendé in early 2026,” adds Botero.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Comments

Latest Multimedia

Photo of Martin Creamer
On-The-Air (12/12/2025)
12th December 2025 By: Martin Creamer

Showroom

ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 December 2025
Magazine round up | 12 December 2025
12th December 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:1.098 1.224s - 189pq - 2rq
Subscribe Now