https://newsletter.en.creamermedia.com
Africa|Financial|Gas|Generators|Power
Africa|Financial|Gas|Generators|Power
africa|financial|gas|generators|power

Nigeria secures $500m World Bank loan for electricity sector

31st May 2024

By: Reuters

  

Font size: - +

Nigeria has secured a $500-million World Bank loan for its electricity sector to boost power distribution, after last month's hike in tariffs for top consumers in Africa's most populous nation.

The Bureau of Public Enterprise (BPE), the country's privatisation agency, on Thursday said the loan was approved by the World Bank in 2021 and included the government's borrowing plan this month after achieving some milestones.

The concessionary loan is aimed at improving the financial and technical performance of distribution companies, which have struggled to increase capacity more than a decade after Nigeria handed over its electricity sector to private companies.

Last month the electricity regulator increased tariffs for better off consumers who use the most power in Nigeria as the government aims to wean the economy off subsidies to ease pressure on public finances.

The World Bank has in the past recommended subsidy cuts to help Nigeria improve the state of its public finances.

Nigeria's electricity sector faces a myriad of problems including a failing grid, gas shortages, high debt and vandalism.

The country has 12 500 MW of installed capacity but produces only about a quarter of that, leaving many Nigerians reliant on expensive diesel-powered generators.

State-controlled power tariffs are too low to attract new investors and allow distribution firms to recoup costs and pay generating companies - leaving the sector with ballooning debt.

The country privatised its electricity sector in 2012, which had been seen as a major hurdle to growth, but funding constraint, gas shortages and challenges with its national grid has limited improvements following the sale.

Edited by Reuters

Comments

 

Latest News

Transnet half-year loss widens to R2.2bn
Transnet half-year loss widens to R2.2bn
Updated 3 hours ago By: Reuters

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.433 0.53s - 209pq - 2rq
Subscribe Now