https://newsletter.en.creamermedia.com
Business|Engineering|Financial|Gas|Oil And Gas|Oil-and-gas|PROJECT|Projects|Resources|Sustainable|Contracting|Solutions|Infrastructure
Business|Engineering|Financial|Gas|Oil And Gas|Oil-and-gas|PROJECT|Projects|Resources|Sustainable|Contracting|Solutions|Infrastructure
business|engineering|financial|gas|oil-and-gas|oilandgas|project|projects|resources|sustainable|contracting|solutions|infrastructure

PetroSA publishes tender for gas extraction joint ventures

6th February 2023

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Petro SA unpacks its latest request for proposals in more detail.  (0.94 MB)
Petro SA unpacks its latest request for proposals in more detail.  (0.89 MB)

State-owned oil and gas company PetroSA has published a request for proposals (RfP), calling on interested parties to submit conceptual proposals to partner with the national oil company in developing upstream assets that will generate revenue for PetroSA on a sustainable basis.

The main objective of these partnerships is to assist PetroSA in commercially monetising the remaining gas potential in the Block 9 production rights and for carrying PetroSA in Block 3A/4A and Block 9/11a.

PetroSA says it will link the success of the projects to financial incentives for the interested parties, which could take the form of sharing in production revenues, performance-based contracting or equity participation. The proposals should preferably include part or full financing of the project. Applications must be submitted to tenders@petrosa.co.za on or before February 28 at 15:00, in a separate manner per opportunity or per asset.

The PetroSA gas-to-liquids facility has operated since the early 1990s, using indigenous natural gas reserves from its offshore Mossel Bay Field (Block 9/11a) in the production of synthetic motor fuels for the local market. PetroSA also holds equity in Block 2A, Block 2C and Block5/6 & 7.

Without further development of indigenous gas production or alternative feedstock strategies, the facility has run out of gas feed. It is capable of processing up to 18 000 bbl/d of condensate from either indigenous origin or through imports.

PetroSA has made Block 3A/4A and Block 9/11a available for joint partnerships to unlock hydrocarbon potential.

The company wishes to extract as much of the remaining gas from existing wells as possible, using optimum technical solutions. The scope is, however, not limited to existing wells only. For example, if an opportunity exists to drill new wells in the existing production right, PetroSA will consider it.

Opportunities also exist to extend gas production further by developing new fields in production rights near the existing offshore infrastructure.

PetroSA says integrated evaluation encompassing all disciplines from geological, geophysical, production engineering, reservoir engineering, well engineering, completions and commercial will be required.

The proposed technical solution should ideally be modelled using well and reservoir models and/or reservoir simulation.

PetroSA will give preference to partners who meet the following requirements: proposals for turnkey solutions, including development and funding; proposals that are fit for purpose and are strategically complementary to the PetroSA business; proposals that are immediately implementable; and interested parties must be credible and have sufficient own financial resources to undertake the projects.

On completion of the evaluation process, PetroSA will nominate a preferred partner or partners and enter into formal development agreements.

Petro SA has scheduled a scope clarification meeting for 12:00 on February 14, on Microsoft Teams, with interested parties being encouraged to RSVP for this meeting by February 13.

To view more information related to the request for proposal, view the attached documents.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest News

Garth Hamilton from HHH Achitects, Azania Muendane from CPFS, James Vos, Tristan Keyte from CPFS, Henry F Herring, and Tlhogi Dube from Unicorn Factory Finance
Cape Town to see construction of R900m film set
2nd December 2024 By: Irma Venter

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine video image
Magazine round up | 29 November 2024
29th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.628 0.735s - 194pq - 2rq
Subscribe Now