https://newsletter.en.creamermedia.com
Construction|Electrical|Energy|Generators|Power|Renewable Energy|Renewable-Energy|Solar|Storage|System|Systems|Turbines|Turbines
Construction|Electrical|Energy|Generators|Power|Renewable Energy|Renewable-Energy|Solar|Storage|System|Systems|Turbines|Turbines
construction|electrical|energy|generators|power|renewable-energy|renewable-energy-company|solar|storage|system|systems|turbines-company|turbines-person

Solar portion of Molo mine’s hybrid power plant completed

7th July 2023

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

Construction of the solar farm portion of the solar hybrid power plant at NextSource Materials' Molo graphite mine, in Madagascar, has been completed.

The solar hybrid plant is owned and operated by CrossBoundary Energy (CBE) under a 20-year power purchase agreement and consists of the 2.6 MW solar farm, a 3.1 MW thermal facility (diesel generators installed prior to mine commissioning), and a 1 MWh battery energy storage system (BESS), which is expected to arrive in the next few weeks.

The solar farm was built by CBE using local labour and comprises 4 902 photovoltaic panels, covering 12 663 m2, installed on ballasted mounting systems.

The 2.6 MW solar farm is expected to produce about 4 GWh of clean energy yearly, reducing the mine’s all-in sustaining costs, and is expected to reduce carbon emissions by 2 275 t/y.

Final electrical interconnections between the solar farm and the mine are now under way and are expected to be completed within the coming weeks.

The solar hybrid plant is designed to generate 33% of the Molo mine’s steady-state power requirements from renewable energy.

The solar facility together with load balancing provided by the BESS will be capable of supplying up to 100% of the plant’s power requirements during peak daylight hours, with the thermal facility supplying all off-peak power requirements, thereby ensuring an uninterrupted power supply to the mine.

NextSource and CBE say they are committed to optimising the solar component and increasing the amount of renewable energy available to the mine, which would include the expansion of the solar farm and the potential addition of wind turbines.

In support of this, CBE has installed a wind measuring light detection and ranging device to evaluate the wind resource at the site and is studying the feasibility of adding wind generation in the short term.

As part of any potential future expansion of the Molo mine, the company has set a goal of increasing the percentage generated by renewable power to at least 50%.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

 
 

Showroom

Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.197 0.288s - 192pq - 2rq
Subscribe Now