https://newsletter.en.creamermedia.com
Exploration|Gold|Infrastructure|PROJECT|Resources|Underground|Drilling|Infrastructure
Exploration|Gold|Infrastructure|PROJECT|Resources|Underground|Drilling|Infrastructure
exploration|gold|infrastructure|project|resources|underground|drilling|infrastructure

Spartan raises A$220m to speed up Dalgaranga restart

5th December 2024

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

ASX-listed Spartan Resources is fast-tracking a production restart at the Dalgaranga gold project, in Western Australia, with a A$220-million placement.

The company on Thursday announced commitments from domestic and international resource-focused institutional investors to raise the cash through a A$1.32-a-share placement.

Spartan’s largest shareholder, Ramelius Resources, has subscribed for shares in the placement to increase its ownership to 19.9%.

“The proceeds significantly strengthen our balance sheet, giving us a pro-forma cash position of $290-million with no debt,” said executive chairperson Simon Lawson.

The proceeds will be used towards enhancing the state of operational readiness at the site, including undertaking mill modifications and infrastructure early works, as well as starting underground development at the high-grade Never Never and Pepper deposits following completion of the underground exploration decline.

A feasibility study is scheduled for release in mid-2025 and Spartan plans to move to a final investment decision shortly thereafter.

“We have come a long way in transforming the Dalgaranga project in less than two years, and we see further huge potential within 5 km of the mill to add ounces and scale beyond Never Never and Pepper,” said Lawson.

Never Never and Pepper will form the core of the restart feasibility study, and the recent drilling success at the likes of Freak, West Wings, Four Pillars and Patient Wolf present opportunities to further increase the resource base and mineral inventory in order to grow production and mine life.

Edited by Creamer Media Reporter

Comments

 

Showroom

John Ratcliffe
John Ratcliffe

At John Ratcliffe, we are aftermarket specialists for heavy-duty on and off-road vehicles. We engineer and retrofit advanced safety systems, engine...

VISIT SHOWROOM 
BOVA Safety Wear
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.195 0.294s - 192pq - 2rq
Subscribe Now