https://newsletter.en.creamermedia.com
Business|Environment|Exploration|Gold|Projects|Resources|Drilling
Business|Environment|Exploration|Gold|Projects|Resources|Drilling
business|environment|exploration|gold|projects|resources|drilling

Volt restarts gold exploration in favourable price conditions

7th April 2025

By: Tasneem Bulbulia

Deputy Editor Online

     

Font size: - +

ASX-listed Volt Resources is reviewing the results of the previous sampling and auger drilling programmes conducted on its Guinea gold projects to plan the next stage of gold exploration activities.

The company’s successful auger drilling campaign identified four drilling targets that extended the known gold anomalous areas in the Kouroussa prospect to over 1 000 m in length; two major gold anomalies in the Konsolon prospect for a combined strike length of over 2 450 m and which remain open with a number of other gold anomalous areas; and a large gold anomaly within the Nzima prospect which is currently 600 m in length and remains open at both ends along strike.

While Volt will continue to focus on the development and operation of its graphite mines and downstream graphite processing business, the potential value creation for shareholders from successful gold exploration in the current record gold price environment provides the incentive for the company to restart gold exploration activities, it states.

Volt has six prospects covering an area of 348.7 km2 in Guinea’s Siguiri basin and has grouped them into three projects – Kouroussa, Mandiana and Konsolon. The projects are held through Volt’s 100% subsidiary Gold Republic. 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (11/04/2025)
11th April 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.134 0.224s - 170pq - 2rq
Subscribe Now