Wärtsilä to supply 18 MW of additional power capacity at Senegal gold mine
Technology group Wärtsilä will supply an 18 MW extension to the power generating facility and also upgrade the electrical and automation system of the existing power plant at gold producer Endeavour Mining’s Sabodala-Massawa gold mine complex, in Senegal.
The upgrade and extension project will allow for the complete integration of all the site’s power-generating capacity, while ensuring the availability of the required electric power to maintain and expand the mine’s production schedules.
The order was placed by mine operator Sabodala Gold Operations and it has been booked in Wärtsilä’s order intake for the third quarter. The project will be delivered under a complete engineering, procurement and construction contract.
The Sabodala-Massawa mine is the largest producing gold mine in Senegal, located in the eastern part of the country in the Kedougou region. Endeavour's planned mine expansion will transform Sabodala-Massawa into a top-tier gold asset with incremental production.
“Not being connected to the grid means that the captive plant has to be capable of providing a reliable supply of electricity at all times, since no power equals no production.
“The Wärtsilä 32 engines selected for this expansion project have . . . high efficiency and reliability under even the most difficult ambient conditions, eliminating revenue losses from power shortages,” said Wärtsilä West Africa energy business director Marc Thiriet on August 16.
The three Wärtsilä 32 engines to be installed are 20% more fuel efficient than the plant’s existing engines. Their fuel efficiency reduces the environmental impact by reducing emissions.
They also have the flexibility to support the integration of solar power and energy storage into the system. The upgrade of the electrical and automation system will optimise the interconnection and control for the existing power plant with the extension, the company said.
The project is expected to be completed and commissioned before the end of 2023.
Wärtsilä already has 543 MW of installed capacity in 20 power plants in Senegal, with 458 MW of this capacity under Wärtsilä long-term service agreements.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation