https://newsletter.en.creamermedia.com
Automation|Business|Construction|Contractor|Design|Energy|Engineering|Export|Financial|Gas|Instrumentation|LNG|Marine|PROJECT|Safety|Services|Shell|Storage|System|Systems|Yokogawa|Solutions
Automation|Business|Construction|Contractor|Design|Energy|Engineering|Export|Financial|Gas|Instrumentation|LNG|Marine|PROJECT|Safety|Services|Shell|Storage|System|Systems|Yokogawa|Solutions
automation|business|construction|contractor|design|energy|engineering|export|financial|gas|instrumentation|lng|marine|project|safety|services|shell|storage|system|systems|yokogawa|solutions

Yokogawa Selected as MAC by LNG Canada and Wins Control Systems FEED Order

2nd December 2014

  

Font size: - +

This article has been supplied.

Yokogawa Electric Corporation  (0.20 MB)

Company Announcement - Yokogawa Electric Corporation has been selected as the main automation contractor for a natural gas liquefaction project that is proposed by LNG Canada, a joint venture comprised of Shell Canada Energy (50%), an affiliate of Royal Dutch Shell plc, and affiliates of PetroChina (20%), Korea Gas Corporation (15%) and Mitsubishi Corporation (15%).

In addition, Yokogawa Electric International, a Yokogawa subsidiary that manages the company’s global control business, has won an order to provide comprehensive control system-related front-end engineering and design (FEED) services to CFSW LNG Constructors (CFSW), the main contractor for LNG Canada. CFSW is a joint venture that was set up by the Canadian subsidiaries of Chiyoda Corporation (Japan), Foster Wheeler AG (UK), Saipem S.p.A. (Italy), and WorleyParsons Limited (Australia) to execute this project.The proposed LNG Canada project includes the design, construction and operation of a gas liquefaction plant and facilities for the storage and export of liquefied natural gas (LNG), including marine facilities in Kitimat, British Columbia. LNG Canada will initially consist of two LNG processing units referred to as “trains,” each with the capacity to produce approximately six million tonnes of LNG annually, with an option to expand the project in the future to four trains.

Subject to a financial investment decision by LNG Canada for the proposed LNG project after the completion of the FEED phase, Yokogawa will proceed to deliver its CENTUM® VP integrated production control system and ProSafe®-RS safety instrumentation system as the project’s MAC. In this role, Yokogawa will also propose various other solutions to the customer with the aim of ensuring the safe and stable operation of the plant.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 
Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 08 August 2025
Magazine round up | 08 August 2025
8th August 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.105 0.227s - 189pq - 2rq
Subscribe Now