Adriana Resources funds Labrador Trough iron-ore project beyond 2020
TORONTO (miningweekly.com) – Despite the expectation that a glut of iron-ore supplies will persist for several years, junior miner Adriana Resources on Monday consolidated its belief in the Lac Otelnuk project, located in Eastern Canada’s so-called Labrador Trough, by making an investment that would fund the Lac Otelnuk Mining (LOM) joint venture (JV) beyond 2020.
Adriana held 40% of LOM, which was a JV company with Chinese-held WISCO International Resources Development & Investment which, in turn, held the Lac Otelnuk property in Nunavik, Quebec.
Adriana announced that it had made an additional investment of $3.05-million following a cash call, while WISCO funded its portion of the cash call with $4.58-million. The JV was expected to maintain a cash burn rate of about $660 000/y to keep the claims in good standing while the JV worked toward the feasibility stage.
TSX-V-listed Adriana stated that it remained optimistic for the future of the Lac Otelnuk project and, while the results of the April 2015 feasibility study demonstrated that the project had attractive economic returns at higher iron-ore prices, the board of LOM had taken actions to cut costs until the iron-ore market favoured the development of the Lac Otelnuk project.
"Ring-fencing the LOM expenditures for at least the next five years allows Adriana to determine the cash balance to deploy into new opportunities, while protecting our investment in LOM. The current depressed financing market continues to create interesting opportunities for Adriana's shareholders," president and CEO Michael Harrison stated.
Adriana noted that it currently had $29.5-million in cash, a strategic partnership with WISCO and a world-class asset. It had also taken steps to conserve cash and reduce all discretionary expenditures and was reviewing opportunities to create shareholder value.
In 2015, the iron-ore price declined by about 70% from its peak in February 2013 as the majors – BHP Billiton, Rio Tinto and Vale – expanded their operations. They were happy to see the price slip as they operated on the lowest-cost tier, as this deterred new developments elsewhere and forced production shutdowns at the most expensive producers.
Other operators currently focused on the Labrador Trough, such as Labrador Iron Mines, were forced to shutter operations owing to the crumbling iron-ore price, while project developers in the area had gone into financial hibernation, waiting for the market to rebound.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation