Anglo Asian says conscripted engineers to return to work in early 2021
Aim-listed gold, copper and silver producer Anglo Asian has lowered its production guidance for the year, as the conscription of several engineering staff and slowed tunnelling progress owing to rock faulting have impacted on production.
The company expects to produce between 68 000 and 72 000 gold-equivalent ounces (GEOs) from Gedabek, in western Azerbaijan, in 2020. Despite lower output, the miner will still reach its targeted turnover of $100-million.
Before the Armenia-Azerbaijan conflict, Anglo Asian had planned to produce between 75 000 and 80 000 GEOs.
The company reported that staff members who were conscripted owing to the territorial dispute with Armenia would return to work early in 2021, after the military started to demobilise.
Earlier this month, Armenia and Azerbaijan signed a Russia-brokered agreement to end a six-week military conflict over the disputed enclave of Nagorno-Karabakh. The region is internationally recognised as Azerbaijani but has been run by ethnic Armenians since 1994.
“On reflection, this has been a challenging year for the company. The difficulties started with the ongoing restrictions imposed due to the Covid-19 pandemic. The year is ending with a peace treaty in place between Azerbaijan and Armenia with international peacekeepers helping maintain the agreement.
"Despite all these headwinds, it is a testament to the entire workforce that the company has continued in operation and remains on track to achieve a turnover of over $100-million for the year, with a significantly strengthened balance sheet, whilst still paying dividends to shareholders,” said Anglo Asian CEO Reza Vaziri.
Anglo Asian would inform the market in due course about its plans for three contract areas that were included in the company's 1997 production sharing agreement with Azerbaijan, that were located within previously occupied areas.
The company said recently that it planned to start work at the Vejnaly project, located in the Zangilan district of Azerbaijan as soon as it is safe to do so. The Azerbaijani army last month liberated the Zangilan district from Armenia, ending the 27-year occupation of the mineral-rich district.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation