https://newsletter.en.creamermedia.com
Cleaning|Environment|Generator|Infrastructure|Pipe|Power|Repairs|Sanitation|System|Water|Infrastructure|Pipe
Cleaning|Environment|Generator|Infrastructure|Pipe|Power|Repairs|Sanitation|System|Water|Infrastructure|Pipe
cleaning|environment|generator|infrastructure|pipe-company|power|repairs|sanitation|system|water|infrastructure|pipe

Cape Town launches live tracking of water, sanitation snags

Image of CoCT's pump station control room

The pump station control room

20th August 2024

By: Irma Venter

Creamer Media Senior Deputy Editor

     

Font size: - +

Cape Town has unveiled a new pump station control room, which digitally tracks the live performance of water and sanitation infrastructure.                    

The control room is already helping to improve response times for urgent infrastructure repairs by monitoring the telemetry alarm system installed across the sewer and water network to provide digital early-warnings, notes the city.

More than R7.4-million has been invested in this digital hub, with staff monitoring 401 sewer pump stations, 58 water pump stations and 60 reservoirs.

This equates to the vast majority of the city’s infrastructure network.

The system is able to directly text response teams when issues arise after hours.

“The tracking system is helping to quickly dispatch teams to attend to infrastructure performance issues,” explains City of Cape Town Mayor Geordin Hill-Lewis.

“We have also reduced responses to false alarms by as much as 50% in the first few months of operation, ensuring more efficient use of our teams attending to faults.”

The new control room is part of a suite of interventions to bring down the impact of sewer spills on communities and the environment, says the city.

Other interventions included investing in resourcing rapid response teams and their fleets; generator and uninterruptible power supply investments to mitigate power failures across the sewer and water network; quadrupling sewer pipe replacement to around 100 km a year; doubling water pipe replacement to 50 km; and proactively jet-cleaning more than 200 km of sewers a year to mitigate blockages and overflows.

“Overall, the city will invest R5.3-billion in water and sanitation infrastructure for 2024/25 alone, more than double the first budget of the current local government term,” adds Water and Sanitation MMC Zahid Badroodien.

 

 

Edited by Creamer Media Reporter

Comments

Showroom

Klüber Lubrication
Klüber Lubrication

Klüber Lubrication ensures that the world’s essential systems—drive units, machines, and water flow—operate efficiently, sustainably, and reliably...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (08/11/2024)
8th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.233 0.329s - 195pq - 2rq
Subscribe Now