City of Cape Town hits apartment building developer with R1m fine
Cape Town Mayor Geordin Hill-Lewis has upheld a decision by the city’s Municipal Planning Tribunal to impose a record R1-million penalty for unauthorised construction work in Belville.
The penalty relates to a developer, named as Steven Kampies, constructing a 22-unit apartment building where only a single dwelling is permitted.
"In upholding this record penalty, we send a clear message that in Cape Town we are working to build a society based on the rule of law, and that the flagrant disregard of building and planning regulations cannot be tolerated,” says Hill-Lewis.
“The law is not only for some, it is for all.”
The building, which includes two storeys of apartments, covered parking and a refuse room, is located in the Oakdale suburb in Bellville.
The site is currently zoned for Single Residential 1 (SR1), which permits only a single residence and related buildings covering not more than 50% of the site.
The City of Cape Town says it ordered a stop to construction in September 2022. However, the developer continued building, while also taking in tenants.
“Occupation of such a building poses a safety risk to tenants without the necessary safety and building plan approvals, land-use rights, and occupation certification."
Following a letter of demand by the city’s lawyers in December 2022, the developer agreed to vacate all the tenants, but by March 2023 “it was clear there was no serious intention in this regard”.
The city then approached the High Court in May, 2023, obtaining an order in October to declare the building and its occupation unlawful.
Given the non-compliance and scope of unauthorised building work, the Municipal Planning Tribunal handed down a R1-million penalty.
The developer’s appeal was considered by the Planning Appeals Advisory Panel, with Hill-Lewis accepting the panel’s recommendation to uphold the penalty amount in his capacity as final appeal authority.
In his appeal outcome report, Hill-Lewis stated that he was satisfied that the administrative penalty was reasonable, given the “gravity and extent” of the contravention.
Further to that, the city notes that the developer could not reasonably claim to have been ill-advised by professionals, given that it had committed similar contraventions in 2021 relating to the construction of 14 apartments at two different erven elsewhere in Bellville.
With the appeal dismissal outcome issued at the end of May, the developer has 20 calendar days to pay the penalty as per the High Court order obtained by the city.
The developer must also comply with all lawful processes regarding the unauthorised building under the city’s Development Management Scheme.
Should the criteria “to regularise the building work” not be met, it may result in the city approaching the court for a demolition order.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation