https://newsletter.en.creamermedia.com
Africa|Construction|Design|Energy|Eskom|Financial|generation|Power|PROJECT|Resources|Solar|Storage|System
Africa|Construction|Design|Energy|Eskom|Financial|generation|Power|PROJECT|Resources|Solar|Storage|System
africa|construction|design|energy|eskom|financial|generation|power|project|resources|solar|storage|system

Construction of 216 MW solar, 500 MWh battery plant starts

A 216 MW solar plant and a 500 MWh battery storage system are set to be constructed by TotalEnergies and  partners in the Northern Cape

A 216 MW solar plant and a 500 MWh battery storage system are set to be constructed by TotalEnergies and partners in the Northern Cape

Photo by Bloomberg

18th December 2023

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

The construction of a major hybrid renewables project in South Africa, comprising a 216 MW solar plant and a 500 MWh battery storage system to manage the intermittency of solar production, has been launched by diversified energy company TotalEnergies and its partners.

The project, located in the Northern Cape, will supply dispatchable renewable electricity to the South African national grid for 20 years, equivalent to over 400 GWh a year.

Under the terms of a power purchase agreement signed in November, and with the incorporation of the storage system, the project will supply 75 MW of dispatchable power to national power utility Eskom on a continuous basis, from 5.00 to 21.30.

“Thanks to its innovative hybrid design, [the project] will enable us to supply continuous green electricity over a longer period and beyond the hours of sunshine,” says TotalEnergies renewables senior VP Vincent Stoquart.

The project achieved financial close on December 14 and is expected to be operational in 2025, as part of the Risk Mitigation Independent Power Producer Procurement Programme launched by the Department of Mineral Resources and Energy to develop electricity generation capacity and help towards alleviating the country’s electricity supply constraints.

“This project will not only contribute to the country’s energy transition, but also to strengthening the resilience of its power system,” he says.

The project is being developed by a consortium of TotalEnergies, which has a 35% stake; Hydra Storage Holding, with a 35% stake; and broad-based black economic empower partner – Reatile Renewables, with 30% stake.

Edited by Creamer Media Reporter

Comments

 

Showroom

Klüber Lubrication
Klüber Lubrication

Klüber Lubrication ensures that the world’s essential systems—drive units, machines, and water flow—operate efficiently, sustainably, and reliably...

VISIT SHOWROOM 
Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.218 0.321s - 217pq - 12rq
Subscribe Now