Egypt, Ethiopia and Sudan hope to break Nile dam talks deadlock in one month
The leaders of Ethiopia, Egypt and Sudan on Monday set a one-month deadline for laying out the ways to break a deadlock in talks over a mega dam Addis Ababa is building along its share of the Nile, an official said.
Egypt and Ethiopia are at loggerheads over the construction of the Grand Renaissance Dam, a $4-billion hydroelectric project that Cairo fears will reduce waters that run to its fields and reservoirs from Ethiopia's highlands and via Sudan.
Ethiopia, which is financing the project alone and hopes to become the continent's biggest power generator and exporter, dismisses the claims. Sudan supports the dam because it will regulate floods and provide electricity and irrigation.
Talks between the three governments have stalled for months over disagreement on the wording of a study on the dam's environmental impact.
On Monday, Egypt's President Abdel Fattah al-Sisi and his Sudanese counterpart Omar Hassan al-Bashir met Ethiopian Prime Minister Hailemariam Desalegn on the sidelines of an African Union summit in the Ethiopian capital Addis Ababa.
"They instructed their water and energy ministers to draw up in one month a report that thrashes out ways to resolve all outstanding issues regarding the dam," an Ethiopian official who attended the talks told Reuters.
The leaders have also agreed to hold heads of state meetings annually, and to set up a fund with the aim of building infrastructure such as a railway linking the three countries, he said.
At the meeting, Hailemariam said the project "was never intended to harm any country but to fulfil vital electricity needs and enhance development cooperation in the region", according to a report by state-run Ethiopian Broadcasting Corporation.
Egypt, Sudan and Ethiopia have agreed to finish the initial technical study within one month, the Egyptian state news agency said, citing the foreign minister.
Tensions over the use of the world's longest river have long simmered between the Egypt and Ethiopia, raising fears the disputes could eventually boil over into conflict.
A major source of disagreement over the construction of the Grand Renaissance Dam is the speed at which its reservoir would be filled.
Now over 60 percent complete, the dam will produce 6,000 MW upon completion. It is centrepiece to Ethiopia's ambitious power exporting plans.
Sudan and Ethiopia have also previously expressed concern over a proposed baseline from which a study by a French firm commissioned to assess the dam's environmental and economic impact would measure the dam's effects.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation