https://newsletter.en.creamermedia.com
Hydropower|Power|Water|Power Generation|Power-generation|Operations
Hydropower|Power|Water|Power Generation|Power-generation|Operations
hydropower|power|water|power-generation|power-generation-industry-term|operations

Egypt, Sudan reject Ethiopian proposal for data sharing on Renaissance dam

12th April 2021

By: Reuters

  

Font size: - +

Egypt and Sudan on Saturday rejected an Ethiopian proposal to share data on the operations of its giant hydropower dam on the Blue Nile after negotiations between the three countries in Kinshasa this week ended without progress.

Ethiopia is pinning its hopes of economic development and power generation on the Grand Ethiopian Renaissance Dam, which Egypt fears will imperil its supply from the Nile. Sudan is also concerned about the impact on its own water flows.

“Ethiopia invites Sudan and Egypt to nominate dam operators for data exchange before the filling of GERD in upcoming rainy seasons,” the Ethiopian foreign ministry wrote in a tweet on Saturday.

But Cairo and Khartoum maintained that they are seeking a legally binding agreement over the operations of the dam, which Addis Ababa says is crucial to its economic development.

“Sudan believes that exchanging information is a necessary procedure, but that the Ethiopian offer to do so in the manner indicated by their letter implies suspicious selectivity in dealing with what has been agreed upon,” the Sudanese irrigation ministry said on Saturday.

After the Kinshasa meeting, Ethiopia emphasized that the second-year filling of the dam reservoir would be carried out as scheduled.

Sudan will hold 600 million cubic meters (785 million cubic yards) of water at its Jebel Awliya reservoir to “ensure the continued operation of the pump stations on the White Nile and the Nile river to meet agricultural and drinking water needs” in preparation for Ethiopia’s second fill, Sudan’s state news agency SUNA reported on Saturday.

The Egyptian irrigation minister on Saturday told a local television talk show that while reserves at the Aswan High Dam could help stave off the effects of a second fill, his chief concern was drought management.

Sudan and Egypt had proposed including the European Union, the United States and the United Nations as mediators in addition to ongoing African Union facilitation of the talks. Both countries said Ethiopia rejected the proposal during the Kinshasa meeting.

Edited by Reuters

Comments

Projects

Showroom

John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 
Weir
Weir

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 22 November 2024
Magazine round up | 22 November 2024
22nd November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.113 0.206s - 185pq - 2rq
Subscribe Now