Flamanville 3 European pressurised reactor project, France – update

Name of the Project
Flamanville 3 European pressurised reactor (EPR) project.
Location
Normandy, France.
Project Owner/s
Multinational electric utility company Électricité de France (EDF).
Project Description
The Flamanville EPR is the first nuclear power station to be built in France in the past 15 years and the first third-generation-type plant. The nuclear plant will have a net electricity output of 1 650 MWe.
Potential Job Creation
Not stated.
Capital Expenditure
The project has been beset by cost increases. In October 2019, EDF said the necessary repairs to the reactor's main secondary system penetration welds would further increase the cost of building the Flamanville EPR, from an estimated €10.5-billion to €12.4-billion.
Planned Start/End Date
Construction work started in December 2007.
Latest Developments
The Flamanville 3 reactor reached 100% nuclear thermal power on December 14, 2025, and generated 1 669 MW of gross electrical power.
The ramp-up to 100% nuclear thermal power follows the approval by the French nuclear safety and radiation protection authority, or ASNR, on December 12, 2025, to go beyond the 80% threshold.
Reaching the 100% mark for the first time allows for the testing of equipment at full power, the taking of measurements and verifying that everything is functioning properly. Over the coming weeks, and as part of the startup programme, the power of the reactor will vary to continue testing at different power levels and an operation will be conducted on an internal electrical substation.
Key Contracts and Suppliers
Areva (nuclear steam supply system); Bouygues (civil work); and Alstom (turbine island).
Contact Details for Project Information
EDF, tel +33 1 40 42 46 37 or email service-de-presse@edf.fr.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation