https://newsletter.en.creamermedia.com
Construction|Consulting|Design|Fencing|PROJECT|Projects|Service|Training|Water|Environmental|Infrastructure
Construction|Consulting|Design|Fencing|PROJECT|Projects|Service|Training|Water|Environmental|Infrastructure
construction|consulting-company|design|fencing|project|projects|service|training|water|environmental|infrastructure

Fort Hare university to manage two R130m water infrastructure upgrades for Alice

10th November 2021

By: Schalk Burger

Creamer Media Senior Deputy Editor

     

Font size: - +

The University of Fort Hare (UFH) will be responsible for the appointment of the professional service providers and contractors for two water infrastructure projects, valued at R130-million, that will benefit students, as well as residents and the economy of Alice, in the Eastern Cape.

The projects include the upgrade of the existing water treatment capacity from 0.93-million cubic metres to 2.9-million cubic metres a year and the construction of a new 4 Mℓ reservoir  to improve water supply to the campus; and the upgrade of the town's wastewater treatment works' capacity from 2 Mℓ a day to 4 Mℓ a day.

UFH will act as the project implementation agent to successfully deliver the projects, which are being funded by the Department of Higher Education and Training. It is envisaged that both treatment works will be operational by March 31, 2023, says UFH Deputy Vice-Chancellor of Institutional Support Dr Oscar van Heerden.

“The UFH Alice campus has been experiencing water problems for some years. In particular, the construction of the new student village has exacerbated the situation and, in order for us to address this, we will be embarking on infrastructure upgrading of the existing water treatment works,” he says.

“Concurrently, the existing wastewater treatment works is also operating above its maximum capacity. With the increase in the water supply, the existing water treatment works would not be able to treat the effluent from both the town and the university. The upgrading of the wastewater treatment works is, therefore, required to treat the increase of the effluent,” he notes.

“Upon completion, the UFH Alice campus will have a more reliable water supply, with adequate pressure, and a sewerage treatment works that can treat the effluent from both the town of Alice and UFH. The increased capacity of the wastewater treatment works will provide for an increase in treated water for agricultural purposes and for effluent discharged into the river that is compliant to environmental standards and regulations,” says Van Heerden.

A project steering committee will be established and will be chaired by Van Heerden. The Amathole district municipality will also be part of the committee as the owner of the water treatment works, as well as the Raymond Mhlaba municipality. The project steering committee will have oversight of the two projects.

The UFH is in advanced stages for the appointment of professional service providers, including an environmental-impact assessment specialist, consulting engineer for the water treatment works and process engineer for the wastewater treatment works.

“The UFH strives to empower qualifying local enterprises in construction by earmarking and ring-fencing specific work packages for small, medium-sized and microenterprises. This will be dealt with once the design work is done and once the various work packages have been identified,” Van Heerden adds.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest Multimedia

Latest News

Magazine round up | 18 April 2025
Magazine round up | 18 April 2025
18th April 2025

Showroom

Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

UP showcases mining VR centre
UP showcases mining VR centre
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.067 0.151s - 151pq - 2rq
Subscribe Now