Gulpur hydropower project, Pakistan

24th October 2014

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Gulpur hydropower project, Pakistan.

Client
Mira Power, a special purpose vehicle incorporated in Pakistan.

Project Description
The project involves the construction of a 102 MW run-of-river (RoR) hydroelectric power project. The project includes a dam, intake structure and a powerhouse.

Energy will be evacuated through an existing transmission line that runs about 200 m from the powerhouse. A 650 m road segment to connect the construction site to the main road will be built.

All the project structures will be located near Barali on the Poonch river about 11 km downstream of Kotli town and about 6 km downstream of the confluence of Bann Nullah river with the Poonch river.

The intake structure and intake portal of the power tunnel will be located on the west bank of the Poonch river, 150 m upstream of the weir structure on the eastern face of a ridge. The powerhouse and outlet will be located on the right bank of the Poonch river about 700 m downstream of the dam structure. The dam will be a concrete gravity dam 66 m high, 205 m long, with a six gate spillway (11.5 m × 6) with an overall width of 86.5 m.

Value
The total project cost is estimated at $365-million, including contingencies.

Duration
Not stated.

Latest Developments
The International Finance Corporation (IFC) proposed an A loan of $60 million, up to $45-million from IFC acting in its capacity as implementing entity for the Managed Co-Lending Portfolio Program and additional mobilisation of up to $25-million through an IFC B loan/parallel loan.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Mira Power, tel +92 300 5003651.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine video image
Magazine round up | 20 June 2025
20th June 2025
Powerfleet GM – Africa Retail Ryan Colyn tells Engineering News that South Africa presents unique challenges in vehicle safety and fleet management
Powerfleet Retail drives innovation and safety in mobility
19th June 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.377 0.531s - 188pq - 2rq
Subscribe Now