https://newsletter.en.creamermedia.com
Africa|Design|Energy|Generator|Huawei|Modular|Power|Solar|Storage|System|Systems|Environmental
Africa|Design|Energy|Generator|Huawei|Modular|Power|Solar|Storage|System|Systems|Environmental
africa|design|energy|generator|huawei|modular|power|solar|storage|system|systems|environmental

Huawei slashes prices of load-shedding backup systems

19th June 2023

     

Font size: - +

Huawei South Africa has slashed the prices of its all-in-one Power-M inverter-and-battery backup systems by as much as R26,000.

The price cuts were announced during the company’s South African P60 Pro launch event in Kyalami on Thursday, 18 May 2023.

The price of the entry-level system with a 5kW inverter and 5kWh of battery storage has been reduced from R78,999 to R69,999 — a drop of roughly 11%.

The same inverter with 10kWh of battery storage would previously cost R127,499 but will now set you back R109,999, a slightly bigger reduction of 14%.

The largest discount is on the top-end option with 15kWh of storage.

This system was previously priced at R175,999, but will now cost R149,999, a drop of 15%.

The latter’s specifications are the closest to the Tesla Powerwall 2, which combines a 5kW inverter and 14kWh battery storage.

The Power-M is similar to the Powerwall in that it combines a sleek and modular design with environmental protection for placement indoors or outdoors.

It supports both on-grid and off-grid applications and can be integrated with solar and generator backup systems.

Like the Powerwall, it is also stackable, allowing multiple Power-M systems to be configured in parallel to support up to 15kW output and 45kWh of battery storage.

Cheaper than the Powerwall

With the latest price reductions, the Power-M has become cheaper than the Powerwall.

The last-available official pricing for the Powerwall and its supporting hardware in South Africa was R170,300.

However, the rand has significantly weakened against the dollar since then, so its price has likely shot up substantially.

When the pricing was last recorded on Tesla’s website — in July 2022 — the rand was trading at about R16-R17 to the dollar.

The local currency has surged beyond R19 to the dollar in the past few weeks.

At the time of publication, Futurama was selling the Powerwall 2 in South Africa for R225,299.

First Energy was charging a much cheaper R167,049. However, it did not have stock of the product.

It should be noted that the Powerwall does offer a higher peak inverter output of 8kW and a better environmental protection rating.

In addition, the Power-M’s 10-year warranty only applies up to 6,000 cycles at a 25℃ operating temperature and with an 80% depth-of-discharge.

Tesla offers a 10-year warranty on the Powerwall with unlimited cycles and guarantees capacity retention of at least 70% after this period.

The table below compares the specifications of the top-end Huawei Power-M system and the Tesla Powerwall 2.

Edited by Creamer Media Reporter

Comments

Showroom

Avlock International
Avlock International

Avlock International is a leading manufacturer and distributor of Specialized Fastening Systems.

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:8.045 8.15s - 195pq - 2rq
Subscribe Now