Interstate-35E project – Phase 2, US


Name of the Project
Interstate- (I-) 35E project – Phase 2.
Location
From I-635, in Dallas, to the Denton County line in Carrollton, Texas, in the US.
Project Owner/s
Texas Department of Transportation (TxDOT)
Project Description
The project entails the design, construction and maintenance of Phase 2 of the project.
The 10 km design-build project includes the full reconstruction and expansion of six existing general-purpose lanes to eight general-purpose lanes, with new auxiliary lanes at entrance and exit ramps, and the reconstruction of frontage roads along the corridor.
The project also includes the reconstruction of the two existing, grandfathered reversible tolled-managed lanes.
Potential Job Creation
Not stated.
Capital Expenditure
The contracts are valued at $640-million.
Planned Start/End Date
Construction is scheduled to begin in late 2021, with substantial completion expected in late 2025.
Latest Developments
The TxDOT awarded Austin Bridge & Road, and Fluor the contract to design, construct and maintain Phase 2 of the I-35E project.
Key Contracts, Suppliers and Consultants
Austin Bridge & Road and Fluor (design, construction and maintenance – Phase 2).
Contact Details for Project Information
TxDOT, tel +1 512463 8588.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation