N2 Wild Coast Toll Road megabridge project – Mtentu bridge, South Africa – update
Photo by Sanral
Name of the Project
N2 Wild Coast Toll Road (N2WCTR) megabridge project – Mtentu bridge.
Location
The bridge will be built over the Mtentu river gorge, near Lusikisiki, in South Africa’s Eastern Cape province.
Project Owner/s
South African National Roads Agency Limited (Sanral).
Project Description
The Mtentu bridge forms part of the N2WCTR project.
The 1.13-km-long bridge, which includes a 260-m-long main span, will be one of the longest main-span-balanced cantilever bridges in the world. Only ten prestressed concrete girder bridges worldwide have a main span of 260 m or longer. Reaching heights of more than 220 m above the river valley, it will displace the Bloukrans bridge, in the Western Cape, as the highest bridge in Africa and the southern hemisphere. The 141-m-tall Pier No 9 (equivalent to a 40-storey building in height) will also be the tallest bridge pier in Africa and the southern hemisphere.
Consequently, the construction of the Mtentu bridge is technically a highly challenging project, with its remote location and local social dynamics adding its complexity.
Potential Job Creation
The project has a local labour contract participation goal of 4%. This will result in at least R141-million being paid to local labour, creating a minimum of 1 550 full-time-equivalent jobs for local skilled and unskilled persons during the contract.
About 2 350 full-time-equivalent jobs will be created during construction, and while job numbers will vary during the contract, an average of 520 jobs will be created every month over 50 months, of which 350 will be filled by locals.
Capital Expenditure
R4.05-billion.
Planned Start/End Date
Construction started in August 2023.
Provided there are no significant delays, construction is expected to take 50 months, with the project expected to be completed at the end of 2027.
Latest Developments
Sanral has reported that R250-million has been spent on the contract to date and 248 local labourers have been employed.
Construction of the access roads to the piers and the third trial blasting operation, as well as geotechnical investigative drilling for Pier 2 and Pier 11, are ongoing.
Key Contracts, Suppliers and Consultants
Dissing+Weitling (bridge design); Mota-Engil Construction South Africa and China Communications Construction Company (main contractors); HVA JV (Msikaba and Mtentu bridge consultants comprising CH2M and SMEC);
Adjacent Contracts
WBHO/H&I JV (main contractor), Knight Piésold (lead consultant – Msikaba to Mtentu); and KBK Engineers (lead consultant – Mtentu to Kulumbe).
Contact Details for Project Information
Sanral, email pressoffice@nra.co.za.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation