https://newsletter.en.creamermedia.com
Building|Construction|Energy|Engineering|Gas|Infrastructure|Oil And Gas|Petroleum|Power|PROJECT|Projects|Services|Storage|transport|Infrastructure
Building|Construction|Energy|Engineering|Gas|Infrastructure|Oil And Gas|Petroleum|Power|PROJECT|Projects|Services|Storage|transport|Infrastructure
building|construction|energy|engineering|gas|infrastructure|oil-and-gas|petroleum|power|project|projects|services|storage|transport|infrastructure

NEP and NZT Power projects, UK

Image of carbon capture

14th March 2025

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
NEP and NZT Power projects.

Location
Teeside, England, UK.

Project Owner/s
Multinational energy company Equinor has a 45% stake in the Northern Endurance Partnership (NEP) with the remaining 45% owned by oil and gas company bp, and 10% by energy and petroleum company TotalEnergies, which also owns a 25% stake in the Net Zero Teesside (NZT) Power project. The remaining 75% is owned by bp, which also provides operator services for both projects.

Project Description
The projects entail the development of the UK’s first carbon capture, transport and storage infrastructure. It includes a c gathering network and onshore compression facilities, as well as a 145 km offshore pipeline, and subsea injection and monitoring facilities for the Endurance saline aquifer located about 1 000 m below the seabed.

The development could transport and store up to four-million tonnes of captured CO2 emissions a year from three Teesside projects, increasing to an average of about 23-million tonnes by 2035 with the future expansion of the East Coast Cluster.

Potential Job Creation
The projects will result in thousands of jobs and wider socioeconomic benefits to the north-east of England.

Capital Expenditure
Building work for both projects is valued at about £4-billion.

Planned Start/End Date
A final investment decision was made in December 2024. Construction is expected to start from mid-2025, with startup in 2028.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Building work for both projects will be completed by nine leading engineering, procurement and construction contractors.

Contact Details for Project Information
Equinor, tel +47 51 99 00 00.
bp, tel +44 207 496 4000 or email bppress@bp.com.
TotalEnergies media relations, tel +33 1 47 44 46 99 or email presse@totalenergies.com; or investor relations, tel +33 1 47 44 46 46 or email ir@totalenergies.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.137 0.291s - 174pq - 2rq
Subscribe Now