New New York bridge project, US
Name and Location
New New York bridge project, New York, US.
Client
The New York State Thruway Authority and the New York State Department of Transportation.
Project Description
The project involves the construction of a new New York bridge to replace the Tappan Zee. The 4.82-km-long Tappan Zee bridge connects Rockland county to Westchester county in the lower Hudson valley (about 40 km north of midtown Manhattan) and is a vital transportation link that serves an estimated 138 000 vehicles a day.
The megaproject will be the single largest bridge project in New York’s history.
The new New York bridge will be transit-ready for all modes of transport, including bus rapid transit, light rail or commuter rail and will include:
• Eight general traffic lanes, emergency lanes and extra-wide shoulders for immediate express bus services when opened;
• A new toll plaza, with at least three highway speed E-ZPass lanes (the current toll plaza includes only two 60 km/h lanes, as well as 10 km/h E-ZPass lanes);
• A dedicated bicycle and pedestrian path on the northern span;
• Safe scenic overlooks, with anticlimb fencing and security cameras to be monitored 24 hours a day; and
• Strength and capacity provisions to accommodate various mass-transit modes.
Value
The project will cost $3.142-billion to implement.
Duration
Construction on the project is expected to start this year, with completion projected for 2018.
Latest Developments
Fluor announced in December 2012 that the New York State Thruway Authority and the New York State Department of Transportation had selected Tappan Zee Constructors – a Fluor-led team consisting of Fluor Enterprises, the American Bridge Company, Granite Construction Northeast and Traylor Bros – for the multibillion-dollar, design-build contract for the new New York bridge project.
The company’s design reduces the weight of the structure and minimises the number and size of foundations required. The design solution also uses a shallow superstructure and a 350-ft-long span design to minimise the number of piers and provide a sleeker-looking bridge that enhances the view corridors within the lower Hudson valley. The main span is a composite deck cable-stayed structural system, with outwardly inclined main span towers that create an iconic look and accommodate future transit loads. The design will allow for dredge quantities to be reduced from 1.8-million cubic yards to less than one-million cubic yards, reducing environmental impacts, costs, and schedule durations. In addition, the construction schedule will benefit from using the unique heavy lifting equipment that is owned by Fluor and its partner, American Bridge. Construction will take about five years, with completion projected for 2018.
Key Contracts and Suppliers
Tappan Zee Constructors (design-build contractor).
On Budget and on Time?
Not stated.
Contact Details for Project Information
New York State Thruway Authority, tel +1518 471 5300.
New York State Department of Transportation, tel +1 518 457 6400.
Tappan Zee Constructors, tel +1 914 409 6203 or email opportunities@tappanzeeconstructors.com.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation