https://newsletter.en.creamermedia.com
Copper|Flow|Gold|Underground|Flow|Operations
Copper|Flow|Gold|Underground|Flow|Operations
copper|flow-company|gold|underground|flow-industry-term|operations

OceanaGold on track to meet 2023 guidance

2nd August 2023

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

TSX-listed OceanaGold is on track to meet its 2023 consolidated production, cost and capital guidance, the company said on Tuesday, reporting its second-quarter results.

The miner, which operates the Haile mine in the US, the Didipio mine in the Philippines, and the Macraes and Waihi operations in New Zealand, produced 130 055 oz of gold and 3 400 t of copper at an all-in sustaining cost (AISC) of $1 318/oz during the three months ended June.

This compares with gold output of 112 300 oz and copper production of 3 800 t in the prior-year period.

Year-to-date gold production amounts to 248 200 oz, keeping OceanaGold on track to meet its 460 000 oz to 510 000 oz gold production guidance this year. Its AISC guidance is set at between $1 425/oz and $1 525/oz.

For the full year, OceanaGold is forecasting copper output of 12 000 t to 14 000 t.

"OceanaGold safely and responsibly delivered strong production outcomes at lower costs during the second quarter, generating strong free cash flow. Both New Zealand sites bounced back strongly, Didipio continued its steady performance, and we remain on schedule for first ore delivery from the Haile underground in the fourth quarter this year,” said president and CEO Gerard Bond.

The miner generated free cash flow of $72.3-million and reported revenue of $301-million.

Edited by Creamer Media Reporter

Comments

 
 

Showroom

BOVA Safety Wear
BOVA Safety Wear

BOVA cemented their reputation in Africa by delivering high quality engineering through their range of safety footwear. 21 years after producing...

VISIT SHOWROOM 
Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.303 0.396s - 194pq - 2rq
Subscribe Now